Responds to Generic Ltr 85-12,TMI Action Item II.K.3.5 Re plant-specific Application of Westinghouse Owners Group Methodology to Address Reactor Coolant Pump Issue.List of Emergency Operating Procedures Provided
ML19354E432
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 01/22/1990
From: Hunsader S
COMMONWEALTH EDISON CO.
To: Murley T
Office of Nuclear Reactor Regulation
References
TASK-2.K.3.05, TASK-TM GL-85-12, NUDOCS 9001310188
Download: ML19354E432 (2)


Text

- - _. .. .

e i #% ., )

Commonwealth Edison

-"[A - }:

5

  • Or.) Fvst Nahonal Plaza, ChicaLo, Illinois .

g Address Reply to: Post Office Box 76T~ l

. Chicago, Ilknois 60690 0767 y..

January 22, 1990 Dr. T.E. Murley l Office of Nuclear Reactor Regtilation U.S. Nuclear' Regulatory Commission j Washington, DC 20555 l

Attn Document Control Desk l j

Subject:

Braidwood Station Units 1 and 2 Reactor Coolant Pump Trip -

Generic Letter 85-12  ;

TMI Action' Item II.K3.5 l HR0 Docket Nos. 50-456 and'50-457

Reference:

a): January 4, 1990, S.P. Sands letter to T.J. Kovach l Dear Dr. Murley Referance [a] provided the results of the NRC staff's review of-the Braidwood Station,-plant-specific application of the Westinghouse Owners Group methodology to address the reactor coolant pump-[RCP] issue defined-In *IMI Action Plan Item II.K3.5. Reference lal requested that Commonwealth Edison verify that the RCP trip criteria has been incorporated in the Emergency Operating Procedures (EOPs) and provide the applicable E0P. procedure number

  • and the date of implementation. The purpose of this letter is-to respond to -

this request.

The following listing provides the E0Ps and their dates of implementation regarding RCP trips EOP Niunher Title Ipplementation Dals BwEP-0 Reactor Trip or' October 17, 1986 Safety Injection BwEP-1 Loss of Reactor or October 17, 1986 Secondary Coolant ,

1 BwEP-3 Steam Generator Tube October 17, 1986 Rupture .,

9001310188 900122 PDR ADOCK0500ggg6 Ro%

. . . . . , . . OO

i

. . + i Dr. T.E. Murley - 2 - January 22, 1990 .

l r

l These procedures were in effect at the time Braidwood Station i received the fuel load license, NPF-57 on October 17, 1986.

l i

Please address any questions regarding this submittal to this office.- !

Very truly yours,

'f Steven C. Munsader Nuclear Licensing Administrator

/sc1:0$$0T 1 ces S.P. Sands-NRR W. Shafer-RIII Resident Inspector-BW