Responds to NRC Re Violations Noted in IE Insp Rept 50-271/80-06.Appropriate Personnel Reinstructed on Importance of Completing All Items on Forms.Correct Data for Scram Test 94 Recorded on Necessary Data Sheet
ML19354C318
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/03/1980
From: Heider L
VERMONT YANKEE NUCLEAR POWER CORP.
To: Brunner R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
WVY-80-95, NUDOCS 8007110460
Download: ML19354C318 (2)


Text

-

O VERMONT YAN KEE NUCLEAR POWER CORPORATION SEVENTY sEVEN GROVE STREET B.4.1.1 RUTLAND, VERMONT 05701 WVY 80-95 J. E. Tribble ENGINEERING OFFICE DEV/WPJ/AK 7"" " "' k * " C ^

DWE/JHM wEsTooRo. M Ass ACHUSETTS 015 81 LHH

?.f.Littlefield LDM/RJW July 3, 1980 W.F.Conway J.A.MacDonald R.M. Grub ed States Nuclear Regulatory Ccamission ficeofInspectionandEnforcement J.G. Rob R.L. Siri D.B.PikeITEiOR I B.C.Slifg 1 Park Avenue RJC/JDC/Q9g of Prussia, PA 19406 H.A.Autio-YR U.P.Murphyt99g{on: Office of Inspection and Enforcement

..P.Palletier-VY Mr. Eldon J. Brunner, Chief

). A. Raid-VY Reactor Operations and Nuclear Support Branch Throno Licsnsinleftigaces: (a) License No. DPR-28 (Docket No. 50-271)

Copy (b) USNRC Letcer to VYNPC, dated June 10, 1980 I&E-Wzsh-1 (Inspection Report 50-271/80-06)

NUS J.Abbsy

Dear Sir:

T.Dignan J.RitEhe$ubject: Response to I&E Inspection No. 80-06 G.C.Andognini J.A.Calhovn This letter is written in response to Reference (b) which indicates that R.Studekone of our activities was not conducted in full :ompliance with Nuclear Regulatory P.HinrikBeguirements. This alleged item of noncompliance was noted during an inspection conducted on April 28-May 1,1980, at the Vermont Yankee Nuclear Power Station in Vernon, Vermont. Information is submitted as follows in answer to the alleged deficiency item contained in the enclosure to your letter.

Item: " Criterion XVII, Quality Assurance Records, of Appendix E to i

10 CFR 50 states, in part: " Inspection and test records shall, as a minimum, identify the inspector cr data recorder, the type of observation, the results, the acceptability and the action taken in connection with any deficiencies noted."

The approved procedure, OP 4424, Revision 5, Control Room Scram Testing, issued September 14, 1979, requires "3.b Record reactor power, reactor pressure, time, date and accumulator pressure on VYOPF 4424.01."

Contrary to the above, data sheets VYOPF 4424.01 for Scram #94 occurring at 2200 on November 19, 1979, did not contain the required reactor power, reactor pressure and accumulator pressure data results."

gool 3!0 8007110,40 g

United States Nuclear Regulatory Commission July 3, 19E Attention: Mr. Eldon J. Brunner, Chief Page 2 Response: Appropriate personnel have been reinstructed on the importance of completing all items on data forms.

The correct data for Scram Test #94 has been recorded on the necessary VYOPF 4424.01 data sheet.

It should be noted that accumulator pressure is required to be recorded for single rod scram testing only and there-fore, was not necessary for Scram Test #94.

We trust this information will be satisfactory. Shculd additional information be required, please feel free to ccatact us.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION Y

L. H. Heider Vice President l

e

)