Response to IE Bulletin 78-04, Environmental Qualification of Certain Stem Mounted Limit Switches Inside Reactor Containment & Informing, Corrective Action to Replace Switches
ML19354A141
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/26/1978
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: O'Reilly J
NRC/IE, NRC/RGN-II
References
IEB-78-004, Serial No. 115C/022178
Download: ML19354A141 (1)


Text

e e..

VIRGINIA ELECTRIC AND POWER COMPANY RJ(CHMOl'TD, VJi:ROIN XA 23261 July,26, 197S:

  • 11r. James P. O'Reilly~ Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region II - Suite 818.

230 Peachtree Street 3 Northwest Atlanta~ Geo.rgia 30303 :

Dear Mr.* 0' Reilly:

Serial No. llSC/022178*

PO&M/DLB:das Docket*

-280


5-6~8}~=----

License ~o~

R-32 DPR-3T::

This is in respon~e*to IE Bulletin 73:..04,. "Environmental Qualification of Certain Stem Mounted Limit.- Switches Inside Reactor Containment".,

At the time of our or.iginal response to this bulletin, dated March 22,. 1978*~ the information requested was not available for Surry Power StationUnit Nos; 1 and 2.

In that submittal we connnitted to perform a survey for these limit switches at the next outage on each unit:&

This survey' ha;'now,been: completed for Surry Unit Nos. I and 2~. Namco Nadel D2400X limit switches were found, to* be in use on three(3r valves on safety related equipment in each c.Ontainment.* In each case these limit switches are on letdown orifice isolation valves.' 'Each unit has 3 *such valves, located in parallel, which are used to select ;the'proper letdown orifice(s) ta use for various ope.rational modes.

These valves also serve*as contairnnent isolation valves.

Our correc.tiv.e a~ti~ri: will be to replace the subject limit switc~hes with qualified switche~. and to locate the "latch in" relays outside containment.*

  • This action is contingent 'upon the availability of qualified materials.

Our tentative schedule is to -c~~plete. these changes* at. the next*. refuel=i:ng on each unit.

Ve1:y truly yours,.

µ~

C. M. Stallings Vice President *- Power Supply and Production Operations cc:.* U. S. Nuclear Regulatory Commission Office of-Inspection and Enforcement Division of Reactor Operations Inspection