Comments on Draft Reg Guide,Task DG-1001, Maint Programs for Nuclear Power Plants. Sys to Be Included in Maint Program Require Clearer Definition,Particularly in Ref to FSAR
ML19353B225
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/29/1989
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
FRN-54FR33983, RTR-REGGD-01.XXX, RTR-REGGD-1.XXX, TASK-DG1001, TASK-RE 54FR33983-00006, 54FR33983-6, NUDOCS 8912140016
Download: ML19353B225 (3)


Text

I-1 504 15 0 0 tt G. enotei5 2ltf W Ger18ral BedriCC0f7438tly F

g David W. Cockfield Vice President, Nuclear November 29, 1989 Trojan Nuclear Plant Docket 50-344 hkM}

License NPF-1 U.S. Nuclear Regulatory Commission Regulatory Publications Branch

[

Division of Freedom of Information and Publications Services Office of Administration i

Washington DC 20555

Dear Sir:

Comments on Draft Regulatory Cuide DG-1001 Maintenance ProKrams for Nuclear Power Plants Attached please find Portland General Electric Company's comments on Draft Re5ulatory Guide DG-1001, " Maintenance Programs for Nuclear Power Plants".

j Sincerely, La Attachment i

c:

Document Control Desk U.S. Nuclear Regulatory Commission Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Re5ulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr. R. C. Barr NRC Resident Inspector Trojan Nuclear Plant 8912140016 891129 PDR RECGD 01.XXX C PDR T21 SW Samen he %rmo Oregen 97m:

+

e 4

6 Trojan Nuclear Plant U.S. NRC Docket 50-344 November 29, 1989 i

License NPF-1 Attachment Page 1 of 2 1

COMMENTS ON DRAFT REGULATORY GUIDE DG-1001 MAINTENANCE PROGRAMS FOR NUCLEAR POWER PLANTS Ceneral Comments A.

Summary of an Effective Maintenance Program (Regulatory Position 1).

This position and other sections throughout the draft guide use the phrase " Maintenance Program".- The definition of this phrase is not clear.

Should a utility develop a separate document titled

" Maintenance Program" which completely implements the regulatory guide, or is a series of individual procedures adequate if, in aggregate, they incorporate all of the provisions of the regulatory guide?

i Regulatory Position 1 also states that the " Maintenance Program" should cover, as a minimum, structures, systems, and components (and their supporting systems) whose failure could significantly affect the safety or security of the facility, and which are included in the plant's current licensing basis and described in the Final Safety Analysis Report (FSAR).

It is not clear whether this is intended to encompass all systems described in the FSAR. The Trojan FSAR contains descriptions of many systems which have little, if any, effect on reactor or radiological safety. Examples include the l

domestic water system, the Turbine Building heating system, and tha I

carbon dioxide system used for purging the main generator.

The i

systems to be included in the " Maintenance Program" require a clearer l

definition, particularly in reference to the FSAR.

(

B.

Goals (Position 3.2).

This position states that information from a plant specific Probabilistic Risk Assessment (PRA) and the Individual Plant Examination (IPE) recommended by the NRC could be an acceptable basis for determining the goals and objectives of maintenance. Although the draft guide says "could", this area is a specific item for inspection in the Nuclear Regulatory Commission (NRC) Temporary Inspection Instruction.

The proposed regulatory guide should emphasize that the use of PRA and/or IPE in determining goals and objectives is optional.

C.

Maintenance Effectiveness Indicators (Position 5.2.3).

This position states that one acceptable method for establishing maintenance effectiveness indicators is to use the methodology of AEOD/S804B, " Application of the Nuclear Plant Reliability Data System (NPRDS) for Maintenance Effectiveness Monitoring". This method is not included in the Institute for Nuclear Power Operations (INPO) software for NPRDS and would require an extensive programming effort on the part of a utility to implement.

I

m --

o o

Trojan Nuclear Plant U.S. NRC Docket 50-344 November 29, 1989 License NpF-1 Attachment Page 2 of 2 Informal contacts with INPO indicate that they may not fully endorse S804B.

The regulatory position should be revised to reduce the emphasis on the use of NPRDS data.

Response to Specific NRC Ouestions 1.

What level of detail should be included in the regulatory guide?

l The present level of detail appears to be adequate. The draft guide contains principles and criteria which can be applied by the utility, and most of the areas are similar to guidelines provided by INpO.

2.

Is the scope of systems, structures, and components covered by the l

regulatory guide appropriate?

l l

No, if the scope is to include all the systems described in the FSAR. A number of the systems described in the Trojan FSAR have little or no impact on reactor or radiological safety.

l' 3.

What criteria could be used to determine that a maintenance program is fully effective and additional improvement is not essential from a j

safety standpoint?

The goals contained in Chapter I, Section C.4 of the INPO " Guidelines i

for the Conduct of Maintenance at Nuclear Power Stations" can be

'{

quantified and used as performance criteria. The INPO guidelines can be supplemented by quantifying the items contained in the draft l

Regulatory Positions 5.2.3 and 5.2.4.

In a broader sense, the inspection areas contained in the NRC Inspection Manual Temporary Instruction (TI 2515/97) provide a comprehensive measure of maintenance' effectiveness, although the criteria are subjective in nature.

4.

Is it appropriate to use quantitative goals, which are described in Regulatory Position 3 of the draft regulatory guide, directed toward achieving a satisfactory level of performance in plant maintenance programs consistent with the level achieved by the top performing U.S. plants of similar design?

Yes.

4 5.

What quantitative measures would be appropriate for such goals?

Should they be at the plant level, system level, component level, or some combination thereof?

The quantitative measures should be a combination of systems and components.