ML19353A891
| ML19353A891 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 11/30/1989 |
| From: | Eddy J CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8912080049 | |
| Download: ML19353A891 (1) | |
Text
'
,,g r
1 Consumers-Power powsame niKMGAN5 NE06RE55
' ooneret officest 1946 West Parnall Rood, Jackson, MI 49201 * (617) 788 0660 November 30, 1989 4
Nuclear Regulatory Commission Document Control Desk'
, Washington, DC 20555
' DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -
INTEGRATED PLAN-ISSUE BN-005D, HUMAN ENGINEERING DEFICIENCIES - MINOR CHANGES, SCHEDULE CHANGE
~ Pursuan't to the requiremen'te of the Integrated Plan, we are required to provide written notification to the NRC of schedule changes to NRC initiated Group B.-issue resolution completion dates at least 30 days prior to the 1 scheduled completion date. Issue BN-005D, Human Engineering Deficiencies -
Minor ~ Changes, was-scheduled for completion by December-31, 1989 and, vill now be completed during the 1990 refueling outage.
-Integrated Plan Issue BN-005D deals with resolution of Human Engineering
' Discrepancies found during the Control Room Design Review. Thirty-three
-discrepancies were identified and to date twenty-eight have been resolved.
Plant shutdown, with specific tagging, is required for completion of the
-remaining items.
Replacement parts had not arrived in time to allow completion of:these remaining items during the 1989 Refueling Outage.
This letter informs the NRC of a completion date extension for this item from December 31, 1989 to the 1990. refueling outage.
[
J' Daniel' Eddy Plant Licensing Engineer CC. Administrator, Region III, USNRC NRC Resident Inspector - Big Rock Point Q0
' l{0 OC1189-0028-NLO2