Responds to IE Bulletin 80-23 Re Valcor Solenoid Valves in safety-related Fuctions.No Such Valves Used.Ten Hours of Manpower Expended
ML19353A335
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/25/1980
From: Crouse R
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
1-174, IEB-80-23, NUDOCS 8101080170
Download: ML19353A335 (1)


Text

-

ey

,/ \\ v/

CO

.g Docket No. 50-346 p;

E3 TOLEDO o

License Na. NPF-3 EDISON Serial No. 1-174 A ' "st P C -

L '?.~

  • November 25, 1980 i

Mr. James Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Rcosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

This letter is in response to IE Eulletin 80-23 dated November 14, 1980, (Log 1-439) as applicable to Davis-Besse Nuclear Power Station. Toledo Edison has determined that there are no Valcor solenoid valves having P/N's V70900-21-1 or -3 at Davis-Besse that perform any safety-related function. No additional response to this bulletin is required by Toledo Edison.

As requested by your letter, the following are estimates of the manpower expenditures in association with this bulletin:

Review, Testing, Preparation of Report - 10 manhours Corrective Action

- O manhours Yours very truly, ff

=:

RPC/TDM/TRP/prk Director, Division of Reactor Operations Inspection cc:

Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C.

20555 NRC Resident Inspector, L. A. Reyes DEC3 3 Ga0 THE TOLEDO EOISON COMPANY EDISON PLAZA 300 MAOISON AVENUE TOLEDO, OHIO 43652