Informs of 24-h Load Test Performed 801127 on Emergency Diesel Generator 1B at Connected Load of 300 Kw,In Accordance W/Resident Inspector Request & IE Bulletin 79-23
ML19353A308
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/17/1980
From: Linder F
DAIRYLAND POWER COOPERATIVE
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-23, LAC-7259, NUDOCS 8101080099
Download: ML19353A308 (2)


Text

i

\\

l flM D

DA/RYLAND h

[k COOPERAT/VE PO BOX 817

  • 2615 EAST AV SOUTH
  • LA CROSSE WISCONSIN 54601 (6 % ) 788 4 000 December 17, 1980 In reply, please refer to LAC-7259 DOCKET NO. 50-409 Mr. James G. Keppler Regional Director U.

S. Nuclear Regulatory Commission Directorate of Regulatory Operations Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

SUBJECT:

DAIRYLAED POWER COOPERATIVE LA CROSSE EOILING WATER REACTOR (LACBWR)

PROVISIONAL OPERATING LICEFSF NO. DPR-45 IE BULLFTIM NO. 79 POTENTIAL FAILURE OF EMERGENCY DIPSFL GFNFRATOR FIELD EXCITER TRANSFOFFEP

References:

(1)

PRC Letter, Keppler to Linder, dated September 12, 1979.

(2)

DPC Letter, Linder to Keppler, LAC-6579, dated October 15, 1979.

Dear Mr. Keppler:

Your letter (Reference 1) requested a full-load operation test of our Emergency Diesel Generators.

The test should verify that voltage and frequency requirements are maintained and that the l

cooling system functions within design limits.

l l

Our letter (Reference 2) informed you of the test on lA Fmergency Diesel Generator.

The 1B Emergency Diesel Generator is rated at 400 KW, The present verified load on 1B Emergency Eus is 276 KW.

In response to con-cerns of the NRC Resident Inspectors, it was agreed that a test at the full-load Load Test Rating of 300 KW would be performed.

On N'ovember 27, 1980, a 24-Hour Load Test was completed on 1B l

Emergency Diesel Generator in accordance with a special procedure.

The test was conducted at a connected load of 300 KW for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

The Resident Inspectors indicated that the successful conduct of this test would satisfy your request (Reference 1) concerning this matter.

In addition, if the load on the IB Er.ergency Bus is later increased above the present Test Load of 300 KW, a test load of at least equal rating will be provided and the 1B Emergency Diesel Generator will be retested.

b l( ' 0 Ok}

%S W

i

\\

\\

l Mr. James G. Keppler LAC-7259 Regional Director, Region III Decemberl7, 1980 5

If you have any questions regarding this letter, please contact us.

Very truly yours, DAIRYLAND POhT COOPERATI\\T v

\\