ML19353A170

From kanterella
Jump to navigation Jump to search
Forwards Addendum 1 To:Analyses of Adequacy of Davis-Besse Nuclear Power Station Onsite Electrical Auxiliary Distribution Power Sys Voltages, in Response to Addl NRC 801114 Questions
ML19353A170
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/02/1981
From:
TOLEDO EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
Shared Package
ML19353A171 List:
References
673, NUDOCS 8101070378
Download: ML19353A170 (1)


Text

.

TOLEDO

%mm EDISON Docket No. 50-346 License No. NPF-3 Serial No. 673 January 2, 1981 Director of Nuclear Reactor Regulations Attn:

Mr. Robert W. Reid, Chief Operating Reactor Branch #4 Division of Licensing United States Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Reid:

On October 9,1979 (Serial No. 543) Toledo Edison responded to your August 8, 1980 (Log No. 416) questions relating to the electrical distri-bution system at the Davis-Besse Nuclear Power Station Unit No. 1.

This letter responds to your additional related questions of November 14, 1980 (Log No. 630).

Very truly yours, ff r-1 RPC:SE l

jh a/1 l

Enclosure l

Addendum 1 To: /umlysis of the Adequacy of the Davis-Besse Nuclear Power in On-Site Electrical Auxiliary Distribution Power i Voltage.

j I

l

~~ cc: '-

/[

NRC, Reside ector s

i i

/ /

l THE TOLEDO EDISCN CCMPANY EC;SCN PLAZA 200 MADISCN AVENUE TOLEDO, CHIO 43652 yg f

8101070