Responds to IE Bulletin 80-11, Masonry Wall Design. Date on Previous Ltr Should Read 820101,not 810101
ML19353A116
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/11/1980
From: Rausch T
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-80-11, NUDOCS 8101070214
Download: ML19353A116 (1)


Text

. - - -

'0

\\.?

eS C:mm::nwulth Edison G

One First National Plaza. Chicago !!!inois i( Oj'! Address Reply to: Post Office Box 767 i

a Chicago, Illinois 60690 y

l December 11, 1980 C

h a

Mr. James G. Keppler, Director Directorate of Inspection and

.ijk Enforcement - Region III 2lq[is'

!?

g U.S. Nuclear Regulatory Commission s

799 Roosevelt Road m

A E

Glen Ellyn, IL 60137 Ri E5$

o G

Subject:

Zion Station Units 1 and 2 o

Supplemental Response to IE Bulletin 80-11 concerning " Masonry Wall Design" NRC Docket Nos. 50-295/304

?

Reference (a):

T. J. Rausch letter to.J. G. Keppler dated December 1, 1980 i

Dear Mr. Keppler:

i Reference (a) provided the Commonwealth Edison Company repair schedule for those masonry walls at Zion Station requiring repair as a result of IE Bulletin 80-11 review.

In this response, it was stated that assuming the level of activity for the ensuing twelve (12) months follows our projections, the necessary repairs.to i

the masonry walls will be completed by January 1, 1981.

The date-should have been January 1,.1982.

We hope that-this error has not caused you any inconvenience.

4 Please address any questions you may have in this regard to this office.

Very truly yours, Thomas J. Rausch Nuclear Licensing Administrator Special Projects cc:

NRC Of fice of Inspection and Enforcement I

Division of Reactor Operations ' Inspection j

Washington, DC 20555 1