ML19352B157

From kanterella
Jump to navigation Jump to search
Forwards LER 81-025/03L-0
Date released: 01/01/2020 Download: ML19352B157


LER 81-025/03L-0:on 810502,PI457C Instrumentation Loop Declared Inoperable.Caused by Pressurizer Pressure Indicator 457C Being Removed from Svc Due to Faulty Lead/Lag Card. Card Replaced
ML19352B158
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/29/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19352B158 (1)
Forwards LER 81-025/03L-0
ML19352B156
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/29/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19352B156 (1)