ML19352A963

From kanterella
Jump to navigation Jump to search
Forwards Util Response to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp
ML19352A963
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/28/1981
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19352A964 List:
References
IEB-80-23, NUDOCS 8106020435
Download: ML19352A963 (1)


Text

,.. I c ""

e, UNITE 3 STATES e

[;Qc 0

""*""'"l,'"'""'"'"

3 m,

G *'I 611 RYAN Pt.AZA DRIVE. SUITE 1000 I

,%,,j ARUNGTON, TEXAS 79011 S

=

April 28,1981 l

e MEMORANDUM FOR: Those Listed Below FROM:

W. C. Seidle, Chief, Engineering Inspection Branch

SUBJECT:

REPLY - IE BULLETIN N0. 80-23 The reply to IE Bulletin No. 80-23 from Houston Lighting and Power Company (South Texas Project, Units 1 and 2) is attached for your infonnation.

L f'

M'1.

M W. C. Se}dle, Chief Engineering Inspection Branch

Attachment:

Letter dated December 23, 1980, G. W. Oprea, Jr.,

to Karl Seyfrit Distribution:

IE Files MPA/DTS NRR/0PM NRR/ DOR

\\

\\/s r

\\

I 818602043,5

._.