Ro:On 741213,during Refueling Outage Circumferential Cracks Found in Unit 2 Stainless Steel Loop B Bypass Line.Cause Not Stated.Corrective Action Being ReviewedML19352A117 |
Person / Time |
---|
Site: |
Dresden |
---|
Issue date: |
12/16/1974 |
---|
From: |
COMMONWEALTH EDISON CO. |
---|
To: |
|
---|
References |
---|
NUDOCS 8103060474 |
Download: ML19352A117 (3) |
|
|
---|
Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO
MONTHYEARML20027A3321978-10-27027 October 1978 RO#77-054/03X-1 on 771102:CRD H-5 Uncoupled During Functional Testing Caused by Unlatched Inner Filter & Abnormally Long Uncoupling Rod.Inner Filter Pull Test in Reassembly Procedure & Improved QA Coverage Incorporated ML19352A1171974-12-16016 December 1974 Ro:On 741213,during Refueling Outage Circumferential Cracks Found in Unit 2 Stainless Steel Loop B Bypass Line.Cause Not Stated.Corrective Action Being Reviewed ML20003C3781974-05-27027 May 1974 Ro:On 740527,diesel Generator 2/3 Declared Inoperable Due to Unstable Load & Machine Inability to Carry Full Load. Cause Not Stated.Required Surveillance & Investigation Initiated ML19352A1191972-09-29029 September 1972 Ro:On 720919,during Routine Calibr of Reactor Low Pressure Permissive Switches,Two Setpoints Drifted Above Tech Specs Value of 350 Psig.Switches Reset & Will Be Sent to Ctr of Trip Setting Span in Future 1978-10-27
[Table view] Category:LER)
MONTHYEARML20027A3321978-10-27027 October 1978 RO#77-054/03X-1 on 771102:CRD H-5 Uncoupled During Functional Testing Caused by Unlatched Inner Filter & Abnormally Long Uncoupling Rod.Inner Filter Pull Test in Reassembly Procedure & Improved QA Coverage Incorporated ML19352A1171974-12-16016 December 1974 Ro:On 741213,during Refueling Outage Circumferential Cracks Found in Unit 2 Stainless Steel Loop B Bypass Line.Cause Not Stated.Corrective Action Being Reviewed ML20003C3781974-05-27027 May 1974 Ro:On 740527,diesel Generator 2/3 Declared Inoperable Due to Unstable Load & Machine Inability to Carry Full Load. Cause Not Stated.Required Surveillance & Investigation Initiated ML19352A1191972-09-29029 September 1972 Ro:On 720919,during Routine Calibr of Reactor Low Pressure Permissive Switches,Two Setpoints Drifted Above Tech Specs Value of 350 Psig.Switches Reset & Will Be Sent to Ctr of Trip Setting Span in Future 1978-10-27
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20249C8491999-09-30030 September 1999 1999 Third Quarter Rept of Completed Changes,Tests & Experiments Evaluated,Per 10CFR50.59(b)(2), for Dresden Nuclear Power Station. with ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20210R6081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Dresden Nuclear Power,Units 1,2 & 3.With ML20209E1291999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Dresden Nuclear Power Station,Units 1,2 & 3.With ML20209J3481999-06-30030 June 1999 1999 Second Quarter Rept of Completed Changes,Tests & Experiments, Per 10CFR50.59.With ML20210D3071999-06-30030 June 1999 Corrected Page 8 to MOR for June 1999 for DNPS Unit 3 ML20195G6381999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Dresden Nuclear Power Station,Units 1,2 & 3.With ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations ML20206N2821999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Dresden Nuclear Power Station,Units 1,2 & 3.With ML20206B1901999-03-31031 March 1999 First Quarter Rept of Completed Changes,Tests & Experiments Per 10CFR50.59 for Dresden Nuclear Power Station. with ML20205N7491999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Dresden Nuclear Power Station,Units 1,2 & 3.With ML20207M6921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Dresden Nuclear Power Station,Units 1,2 & 3.With ML20207E9311999-02-26026 February 1999 Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced ML20199M0891999-01-22022 January 1999 Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc ML20199D3261998-12-31031 December 1998 10CFR50.59 SER for 1998-04 Quarter, of Changes,Tests & Experiments.With ML20199C8951998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Dnps,Units 1,2 & 3 ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with ML20197G8591998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Dresden Nuclear Power Station.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20196J0061998-11-19019 November 1998 Rev 66 to Topical Rept CE-1-A, QA Program ML20195D2861998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Dresden Nuclear Power Station.With ML20154L3681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Dresden Nuclear Power Station,Units 1,2 & 3.With ML20154N4131998-09-30030 September 1998 1998 Third Quarter 10CFR50.59 Rept, for Dresden Nuclear Power Station of Completed Changes,Tests & Experiments ML20153C5061998-09-21021 September 1998 SER Accepting Qualified Unit 1 Supervisor Initial & Continuing Training Program for Dresden Nuclear Power Station,Unit 1 ML20151Y2711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Dresden Nuclear Power Station,Units 1,2 & 3.With ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237A7161998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Dresden Nuclear Power Station,Units 1,2 & 3 ML20236Q5851998-06-30030 June 1998 1998 Second Quarter 10CFR50.59 Rept, for Dresden Nuclear Power Station of Completed Changes,Tests & Experiments ML20236F8131998-06-30030 June 1998 Rev 0 to Defueled SAR Dresden Nuclear Power Station Unit 1 Commonwealth Edison Co ML20236T8331998-06-30030 June 1998 COLR for Dresden Station Unit 3,Cycle 15 ML20236T8391998-06-30030 June 1998 Rev 1 to EMF-96-141, Dresden Unit 3 Cycle 15 Reload Analysis Rept ML20236M6041998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Dresden Nuclear Power Station,Units 1,2 & 3 ML20248M3021998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Dresden Nuclear Power Station,Units 1,2 & 3 ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted ML20247F3391998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Dresden Nuclear Power Station,Units 1,2 & 3 ML20217D0281998-04-22022 April 1998 Part 21 Rept Re Additive Constants Used in MCPR Determination for Siemens ATRIUM-9B Fuel by Core Monitoring Sys Were Found to Be non-conservative.SPC Personnel Notified All Customers w/ATRIUM-9B Lead Test Assemblies ML20216D4411998-03-31031 March 1998 First Quarter Rept of Completed Changes,Tests & Experiments for 10CFR5059 ML20216C9651998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Dresden Nuclear Power Station,Units 1,2 & 3 ML20216E2531998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Dresden Nuclear Power Station ML20202F7831998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Dresden Nuclear Power Station ML20199K1651998-01-23023 January 1998 Rev 65h to Topical Rept CE-1-A, Comm Ed QA Tr ML20198P5321997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Dresden Nuclear Power Station ML20198P7021997-12-31031 December 1997 Fourth Quarter Rept of Completed Changes,Tests & Experiments Per 10CFR50.59 ML20216D3611997-12-31031 December 1997 Unicom Corp 1997 Summary Annual Rept ML20203F8781997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Dresden Nuclear Power Station ML20199B0701997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Dresden Nuclear Power Station ML20217H7201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Dresden Nuclear Power Station,Units 1,2 & 3 ML20210V2401997-09-19019 September 1997 Rev 65g to Topical Rept CE-1-A, Comm Ed QA Manual ML20216J3781997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for DNPS ML20210H5511997-07-31031 July 1997 Monthly Operating Repts for July 1997 for DNPS IAW RG 1.16 & GL 97-02 1999-09-30
[Table view] |
Text
_ _ _ _ .
t p
Date: 12/16/74 No.
DIRECTORATE OF REGULATORY OPERATIONS _
NOTIFICATION OF AN INCIDENT OR OCCURRENCE Facility: COMMONWEALTH EDISON COMPANY (DRESDEN UNIT 2)
Problem: CRACKS IN 4" RECIRCULATION PIPING The licensee reported to a Region III inspector at the site on Dececber 13, 1974, that circumferential cracks had been found in the Dresden 2, 4" stainless steel "B" loop bypass line around the primary recirculation The failures were located downstream of the pump pump discharge valve. A similar crack discharge valve and cannot be isolated by system valves.
was located in the "A" bypass loop of Unit 2 on September 13, 1974.
(Reference Notification of an Incident or Occurrence Number 125, dated September 18, 1974.)
The following information was provided by the licensee in telephone conversa-tions on December 13 and 14, 1974, and from the Region III inspector at the plant on December 13, 1974: ,
- 1. The unit was in a efueling outage. The cracks were found visually following the grinding of the pipe wall surface in preparation for an ultrasonic test required by the in-service inspection program.
- 2. Subsequent ultrasonic testing indicated that two cracks"B" were present loop 4" l
in the heat affected zone of the veld which ties the One pipe to the veldolet connecting to the 28" recirculation header.
crack indication on the inside of the pipe is about 4"The longother extending crack circumferential1y from the 2 to 6 o' clock position.
indication is 1 1/2" long extending from the 7 to 8:30 o' clock position.
ultrasonically tested in mid September 1974. No
- 3. This weld had been crack indications had been detected at that time.
- 4. Ultrasonic inspection of the other velds in "B" loop revealed four other indications at weld joints as shown on the attached sketch.
The licensee is currently performing an ultrasonic test of the welds in the "A" loop.
I
- 5. The licensee is currently reviewing corrective action.
l
- 6. A press release of the failure is planned by the licensee.
i F7'd3b&oe /7
---e -
^ - _
Action Taken by Regulatory Operations J
- 1. Region III inspectors were at the site on December 13, 1974, when the defect was found. Followup is continuing and further RO action is contingent on findings and generic implication.
- 2. A press release will be issued by Region III.
- 3. The Assistarts to the Commissioners, the Staff of the Joint Committee on Atomic Energy and the Office of Information Services have been notified by telephone.
- 4. A representative of the State of Illinois was informed.
Enclosure:
As Stated l
l l
l
(
I l
l l
l l
\
Ore s clen 2 '?ec.irc.ulal*io n Ape e l- ecfs
~
Dec e m her it , I 9 7 'l
'E[+, o , ' .2 B "
/ j P,y,' ny
' s
/
tiecire. Loea+ ion f fu-,e
' b ~ loop 0=f
\ Z c N % ~
L
~-SEA. ,_ g ;;., g d N ,j rea.eo- e i,= X - s m ..n=
. ., . s
,,,. /
$ fo:S bCO? ,
Y A
[
I
/[#
t o e a +.'e n cf d ra C l(3 f 40 mdH CHB PDDR BRIG NM '*/"/"
DCC ! e i.
~
E # ~/
O i UNITED STATES ATOMIC ENERGY COMMISSION 1 .
,g) T DIRECTORATE OF REGULATORY OPERATIONS 1, / s REGION lli f,
" 799 ROOSEVELT ROAD GLEN ELLYN ILLINots 6o137 (3 t2) a ss.2e se December 16, 1974 H. D. Thornburg, Chief, Field Support and Enforcement Branch, Directorate of Regulatory Operations, Headquarters DIRECTORATE OF REGULATORY OPERATIONS NOTIFICATION OF AN INCIDENT OR OCCURRENCE - DRESDEN UNIT 2 CRACKS IN 4" RECIRCULATION PIPING The attached communication covering the preliminary information from the inspection conducted by the licensee of Dresden 2 cracks in 4" recirculation piping is forwarded with the recomendation that it be issued as a " Blue Sheet."
'$$G G. Fiorelli, Chief Operations Branch
Enclosure:
As above cc: S. E. Bryan, RO III Coordinator, RO:HQ J. O. Keppler, R0:III DR Central Files R0 Files S
go -
1