ML19352A110
| ML19352A110 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 04/19/1976 |
| From: | Switzer D CONNECTICUT YANKEE ATOMIC POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-76-02, IEB-76-03, IEB-76-2, NUDOCS 8103060086 | |
| Download: ML19352A110 (1) | |
Text
-
& CONNECTICUT YANKEE ATOMIC POWER COMPANY l \\ f v.,
- 4. E R Li N. CON N ECT4 C UT P. o. som 2 70 H ARTFORD CONNEC11 CUT 06101
,, =,,
April 19,1976 Docket flo. 50-213 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 Referen:c: Office of Inspection and Enforcement Bulletin flos. 76-02 and 76-03
Dear Mr. O'Reilly:
In response to the above referenced 01&E Bulletins, an investigation was conducted to determine if any of the affected relays are in use at Connecticut Yankee.
The results of the investigation revealed that no relays of the affected models or vintages are used in safety related systems at Connecticut Yankee.
Very truly y'urs, o
l CONNECTICUT YANKEE ATOMIC POWER COMPANY 10/{$
D. C. Switzer President DCS:WJD/jba cc: NRC, Office of Inspection and Enforcement Division of Reactor Inspection Programs
/
Washington, D.C.
20555
-