[,g] C O N N E CTIC U T YANKEE ATOMIC POWER COMPANY fj" 3 7
Nt
' '/
BERLIN. CO N N ECTIC U T
\\\\
(
Y P. o. sox 27o H ARTFORD, CONNECTICUT 06 tot aos see$ssii August 17, 1976 CYH - 3411 Docket No. 50-213 U. S. Nuclear Regulatory Commission Region I Office of Inspection and Enforcement 631 Park Avenue King of Prussia, PA 19406 Attn: Mr. James P. O'Reilly, Director
Reference:
Office of Inspection and Enforcement Bulletin No. 76-07 dated July 28, 1976
Dear Mr. O'Reilly:
In accordance with the requirements of Inspection & Enforcement Uulletin No. 76-07, the following information concerning crane hoist control -
circuit modifications is hereby submitted:
~ 1.
(a) Connecticut Yankee has not made nor do we plan to make modifications to the hoist control of our installed cranes. The cranes do not have a hoist control circuit similar to the one described in the referenced bulletin.
1.
(b) Not applicable.
See 1. (a) above.
1.
(c) Not applicable.
Brake power contactors are not used in Connecticut Yankee crane hoist circuits.
2.
Not applicable.
See 1. (a) above.
Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY h0 D. C. Switzer President DCS:RHG/jba cc: Director Division of Reactor Inspection Programs Office of Inspection and Enforcement
/
U. S. Nuclear Regulatory Commission
\\
20555 p p g g g g shington, D. C.