ML19351G502

From kanterella
Jump to navigation Jump to search
Forwards Revision 1 to QA Plan BCL-NSP-2, Packaging & Transport of Licensed Radioactive Matls. Response to NRC Request for Addl Info Encl
ML19351G502
Person / Time
Site: 07100138
Issue date: 01/27/1981
From: Toy H
Battelle Memorial Institute, COLUMBUS LABORATORIES
To: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML19351G503 List:
References
18359, NUDOCS 8102240050
Download: ML19351G502 (3)


Text

9

^ P o r9 -

9)'l2 cD Y

)D *D N$

l

.M R\\ w I 1S

@Batelle

-u-

- 1.dorat.r -

=, -.

-.3 et ns: (. e w c.-uo%mr ie -*

I 4' 4., ' r.42 J T..

m

~ ~. ~.

January 27, 198'.

..g

/.D~

/

poccTED ki-A ussac Q'

I"$

gB 0 4 9St > hy "r. Charles MacDonald, Chief Transportation 3-anch s.

sgs5

/

d gg. 510~W

/

Division of Fuel Cycle and ccCG C O

ttaterial Safety N

U.S. tiuclear Reg.latory Ccenission

  1. s 1!ashington, DC 20555

Dear Mr. MacDonaid:

Battel:e,71-:133)

Enclosec are se.en (7) copies of Batti.le's ::iumbus Laboratories' Quality Assurance P!an, 3CL-ilSP-2, Rev. i, fer -he :1:kaging and transport of radioac 've materials.

This :lan revision has been pre:ared to respond t: your request of Septerber 2,19E2, for additional inf: cati:n for your review.

The attached Table i contains the additional inic-stion request state.~ents, and the secti:n and page number -ef arence to the res:: se in:crporated in the plan.

As a result of transportation damage to a wooden secondary containment package, SCL's pemit for radioactive waste cis:osal in the State of tievada has been indefinitely sus; ended. The reinstate ent of this permit requires approval of the BCL revised Q. A. progran for packi;ing and transportation of radioactive material by both the State cf :levada and llP.C.

Battelle, therefore, requests the fiRC tc review the revised Q.A. progra plan and perform an ins::ection of the pl an's implementation. Arrangements #:r such an inspection of the plan have been ade with "r. Charles Peck, an i s:ector assigned to your Region III off':e.

A cop / of BCL-TiSp-2, Rev.1, has been #:rwarded to ffr. Peck.

He will conduct an audit art ins;:e: tion of the implementation Of our plan during his next for-al inspection of 30:.'s license activities.

Battelle requests the URC to notify Mr. John Vaden of the ?levada Depart e. of Human Resources in Las Vegas when inspection resul s verify BCL's ccroliar.ce to the approved plan.

Battelle may then apoly to tne 5 tate of fievada for rainstatement of the per :it to transport radioactive waste to a li ansed contractor in the State of fievada for burial.

co a

(.y '

4 1

W 2.~dlul I) 4 l

l

, 9..

e t n 0 5 581 $

d

.i r

p s

-.- ~ " =

s

= A 5

o f?

1ESE9 o%gf ".C.

~

8102240070

m

' '. Chir'es Mac::.ald 2

January 27, 1981

':ur ex:editicus review of our plan will tc appreciated.

Sh0uld cuestions ar se, ring y:;- review or questions relative to the reinstatement process of

- :e -it tc a. r.0rize utilization of the Nevada State Radioactive Waste Dis:csa Site, : Tease contact me at 614-424-7791.

lery truly yc.-3, Harley _. Toy

  • i3C Licensing C::rdinator

'LT:iba Enc. (E:

cc:

Mr. John laden, Supervisor Ri:icleg':al Health State of ?iavada

e:artme
f Human Resources La s 'lega s, :"I 89158 r

I l

l t

l t

BATTELLE (71-0133)

.{

1

-D e

TABLE 1.

REOUEST F0; -:DITIO::AL IMFC'ATION Se(on age Information Re;.estec g

1.

Des:":e tne qualification require er.:3 for the ;ri ipal 1

3 QA.:: anagement positiens.

2.

Iden-ify the management level (i.e., above or outsice the 1,18 4,42 QA : ganization) who regularly assesses tne scope, 5 atus, it: e entation, and effectiveness of tne QA progra-to ass. e that the program is adecuate an: :mplies witn 10 :FR 71, Appendix E criteria.

3.

Ide ify the organization (s) who are assigned to detarnine 1

4 tha-functions delegated to contractors are being ;r:perly ac:: :lished.

4.

Gi.e a brief summary of Battelle's cor:: rate QA pol':ies, 1

2

a's, and objectives.

5.

es: ibe how all responst51e orga.':at :ns and indi.iduals 2

11 are ade aware that quality policies, - e QA manual, and pr::edures are mandatory require ents.

6.

i ify the safety-related stru: res. sjstems, an:

2 10 cc : rents controlled by the QA r:gra.

7.

pr: vide a statement that Battelle revisas and docu ents 2

11 agree ent with the QA program provisier.s of his contractors for assurance that the requirements of Appendix E will be ir:lerented.

8.

Des: ibe how disputes involving :;ality, arising fr:1 a 2

11 di3#erence of opinion between QA/0C personnel and c:ner de:ar-ent (engineering, procure ent, anufacturing, etc.)

pe-s:enel are resolved.

9.

Pr: side a statement that quality-related activities are 2

11 pe #cmed with specified equipment and under suitable environmental conditions, and prerequisites have been sa:isfied prior to inspection and test.

10. Pr: cide a statement that audit data are analyzed and the 18 41 re::rts, wnich indicate quality trends and the effe::ive-ness of the QA program, are reported :: :anagement #:r re.'aw and assessment.

o, - u