ML19351G283
| ML19351G283 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 02/06/1981 |
| From: | Hines E DETROIT EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, EF2-49-879, NUDOCS 8102230426 | |
| Download: ML19351G283 (1) | |
Text
Ecosto Hms s.
Detroit
... - =c.
, /."; :c..
- va a
.m February 6, 1c81 DJ EF2-49,879
.p-%p s
J q.v
.f p s s lY 0L E ? '.h b.$
I ~J T
Mr. James G. Keepler, Director
- 3-fC n, U ibc } h
.g@,
Reg. ion 111
- D3,g*c4 C U. S. Nuclear Regulatory Cc=missicn 799 Roosevelt Read M
2, Glen Eliyn, IL 60137 Y %, / ~ _f
/
Dear.*..ccc'er:
Subject:
Interi, Report of ICCFR50.5f(e) Item on Cable Pulling Problems (:33)
On January 8, 1931, Detroit Edison's Mr. T. A. Alessi, Director, Project Quality Assurance, telephoned Mr. R. Knop of the NRC, Regien lit, to recort a problem with cable damage cue to cable pulling operations.
The a;: parent damage to cables was caused by having cables in contact with sharp edges, and cue to inapprcpriate use cf ty wraps. The problem areas are being investigated to ascertain whether there actually has been damage done to the affected cables.
Investigation has not been completed at this time.
A final report is scheduled to be submitted to you by April 30, 1931.
I f you have questions concerning this matter, please contact Mr.
H. A. 'Wa l ke r, Supervisor, Construction Quality Assurance.
Very truly yours,
/i.
/
~
/
s O hACMl /WA HAW:mb cc: 'Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Division of Reactor inspection Programs U. S. Nuclear Regulatory Ccemission Washington, DC 20555 Mr. Bruce Little, Resicent inspector U. S. Nuclear Regulatory Ccenission g lj Resident inspectors Office 6450 North Dixie Highway
[l Newport, MI 48166 i
8102280-.
W %2d
-