ML19351G186
| ML19351G186 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 01/09/1981 |
| From: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 11031, IEB-80-21, NUDOCS 8102230239 | |
| Download: ML19351G186 (1) | |
Text
_.
TEC O' Comp 8nY CollSumBIS e
- / [Jemos W Cook p Power fy f
^ Hid Vresident(- Projects, Engsneenng 5'
, and Constructwn
- g s'.
General Othces 1945 West Parnell Road, Jackson, MI 49201 * (517) 788 0453 g
-- [, '
*r
/>
January 9, 1931
/q
/
m __
JGKcppler US I;uclear Regulatory Commission Region III 799 Roosevelt Rd Glen Ellyn, IL 60137 MIDIA::D PROJECT DOCKET I 0 50-329, 50-330 IE BULLETII; 80-21, " VALVE YCKES SUPPLIED BY MALCOIR FOU:iDRY CCMPA!!Y, II;C."
FILE: 0505 12 UFI: 99*02*05*10 SERIAL: 11031 This is an interim response to the subject IE Bulletin. To date only one valve supplier (Anchor Darling) has supplied a response to us and it was a negative response. The final determination as to whether or not the subject valve yokes are utilized at Midland will be made following our receipt of responses from the rest of the valve suppliers. It is anticipated that our final response to you will be in March 1981.
e JJC/JIiL/cr CC RJCook, Midland Site Inspector DHood,IiRC DBMiller, Midland liCMosely, IiRC DO2 2stg JAN 15 1981