Text
T
~
~
71 c EOwQrd Mines Ass s'a-t ne Pres.een owa r, Ass 'a ce troit sYJC SeCOnd AveNe ISOn amr~=
January 19, 1981 EF2-49,889 Mr. James G. Keppler Regional Director U.S. Nuclear Regulatory Commission g
g Region III
//[
799 Roosevelt Road Glen Ellyn, Illinois 60137 g
FEB0 E ISBf gg' Re fe rence: Enrico Fermi Power Plant, Unit 2 u,,
USNRC Licensing Docket: 50-341 y
coMy USNRC IE Bulletin 80-21 (11-6-80)
Q 4
Subject:
Detroit Edison Response to NRC IE Bulle r,,
Dear Mr. Keppler:
The final report of our analysis and evaluations of the potential valve castings materials problem described in the subject bulletin cannot be submitted to your office at this time. Pursuant to the reporting requirements specified in the subject bulletin we submit the following interim response:
The results of our initial determination of those Festmi II a.
valves that may contain parts cast by Malcolm Foundry Company, Inc.
are not yet cocplete.
Responses from all manufacturers queried have not been received as of this date. Follow-up actions are These continuing to complete this phase of the investigation.
include participation in the NOMIS committee investigation.
i The names of the affected manufacturers supplying safety-related b.
valves to the Fermi II Project are provided on the t.ttached listing.
Our planned action is to formulate a verification, testing and c.
upgrading program once the extent of the potentially faulty l
components situation is determined.
l The schedule for accomplishing this action is indeterminate until d.
such time as the required scopr of the investigation of acceptable mechanical propertiss is established.
This situation necessitates that we request an indefinite extension of Detroit Edison Project Engineering will continue the reporting date.
to keep the review moving and will notify yo'ur office of any definite developments.
8102230/OT Q
'JM 2 6 gg l
b
,I Mr. James G. Keppler January 19, 1981 Page 2 EF2-49,889 Should you require additional information from Detroit Edison in this matter, please advise us.
Very truly yours, EH/JDR/Im Enclosum i
cc: Director Division of Reactor Construction Inspection Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 l
Director Division of Reactor Operations Inspection Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.t.
20555 Director Division of Operatint, Reactors i
Office of Nuclear Reactt* Regulation U.S. Nuclear Regulatory C.t,.crission Washington, D.C.
20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Commission j
Resident Inspector's Office 6450 North Dixie Highway Newport, Michigan 48166
,i-t I
~
o o
i
\\
Attachrent to EF2-49,8B9 January 19, 1981 ENRICO FERMI II PROJECT MANUFACTURERS OF SAFETY RELATED VALVES Anchor Darling Powell Atwood & Morrill Harrison /Rockwell Control Components Velan Crosby Xomox Dragon Ke rotest Fisher Controls Marotta GPE Controls Target Rock Jane sbury