ML19351F890

From kanterella
Jump to navigation Jump to search
Application for Amend to App a Tech Spec 6.5.2.8 of Licenses DPR-57 & NPF-5.Amend Would Provide Grace Period for Audit Frequencies & Eliminate Requirements for Annual Audit of Fire Protection & Loss Prevention Programs.Amend Fee Encl
ML19351F890
Person / Time
Site: Hatch  
Issue date: 02/09/1981
From: Widner W
GEORGIA POWER CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19351F891 List:
References
NUDOCS 8102200441
Download: ML19351F890 (4)


Text

-..

w m,, c m 8

, P; 3 m e.. p,,

e oam er..m

.< ama a x sc.

, wa ~:: oc c,

A Geof i Ibwer mmk,g a-mf5Yn W. A. Widner

" *Y

l

'& j '?l?~'' *#

r wy A

3 gm wa

-I MC Director of Nuclear Reactor Regulation ri W

=

U.

S.

Nuclear Regulatory Comm'e ion O

to S

Washington, D. C.

20555 NRC 00CKETS 50-321, 50-366 OPERATING LICENSES OPR-57, NPF-5 EDWIN I.

HATCH NUCLEAR PLANT UNITS 1 AND 2 TECHNICAL SPECIFICATIONS AUDIT REQUIREMENTS Gentlemen:

Pursuant to 10 CFR 50.90 as required by 10 CFR 50.90(c)(1), Georgia Power Company hereby requests a change to the Technical Specifications (Appendix A

to the Operating License).

The proposed changes to Technical Specification 6.5.2.8 provide a

grace period for audit frequences and eliminate requirements for an annual audit of the fire protection and loss prevention programs during the year in which the three-year audit is performed.

The changes would be incorporated into the Technical Specifications of both units.

The Plant Review Board and the Safety Review Board have reviewed and approved the proposed changes and have determined that they do not involve a safety issue.

The changes are for convenience only, and will not affect plant operation.

Enclosed with the proposed changes are a determination of amendment class and instructions for incorporation of the proposed changes into the Unit I

and Unit 2

Technical Specifications.

i l

Very truly yours, i

M d.

W.

A. Widner Enclosures Sw to and supscribed before me this 9th day of February, 1981

. _. / /. M h No t a r y Pub 1ic. Notary Public. Georgia, state at Large My Commission bpires Sept. 20.1983 -

t l

t' 810 220 0 94 Is h

r- -

ATTACHMENT 1 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I.

HATCH NUCLEAR PLANT UNITS 1, 2 PROPOSED CHANGES TO TECHNT. CAL SPECIFICATIONS Pursuant to 10 CFR 170.12 (c),

Georgia Power Company has evaluated the attached proposed amendment to Operating Licenses DPR-57 and NPF-5 and has determined that:

a)

The proposed amendment does not require the evaluation of a new Safety Analysis Report or rewrite of the facility license; b)

The pJoposed amendment does not contain several complex issues, does not involve ACRS review, or does nnt require an environmental impact statement; c)

Tne proposed amendment does not involve a

complex issue, an environmental issue or more than one safety

.ssue; d)

The proposed amendment does not involve a

single safety or environmental issue; e)

The proposed amendment is administrative in nuture;

namely, the addition of a

grace period for audit frequencies and the elimination of a superfluous audit requirement; f)

The amendment is therefore a Class II amendment for one unit, and a Class I amendment for the other unit.

..pu

.. y e. a w a-;

r w a.a: m m-~ ~.

sa i

~

ATTACHMENT 2 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I.

HATCH NUCLEAR PLANT UNIT 1 PROPOSED-CHANGE TO THE TECHNICAL SPECIFICATIONS The proposed change to the Technical specifications (Appendix A to the Operating License) rould be incorporated as follows:

Remove Pace Insert Pace 6-11 6-11 l

i l

l l

l l

l l

l m

m m

-.-m.m.

m

. mm.

ATTACHMENT 3 NRC DCCKET 50-366 OPERATING LICENSE NPF-5 EDWIN I.

HATCH NUCLEAR PLANT UNIT 2 PROPOSED CHANGE TO THE TECHNICAL SPECIFICATIONS The proposed change to the Technical Specifications (Appendix A to the Operating License) would be incorporated as follows:

Remove Page Insert Page 6-10 6-10 d

  • r