PORTLAND GENERAL ELECTRIC COMPANY f
f ELtcTmic BUILDING PORTLAND. OREGON 97205 JOSEPH L. WILLIAMS c.....,
January 28, 1974 j
Docket No. 50-344 s
9 Mr. R. H. Engelken, Director A
4 h Directorate of Regulatory Operations k[C@{0 (,
Region V JAtt31 3974 c U. 5. Atomic Energy Commission C
PEGIOlI y E
P. O. Box 1515 C
DIR. CF REG Berkeley, California 94701 OPER,tagg 4
Dear Mr. Engelken:
E L
On January 3,1974, you sent us DRO Bulletin 74-1 involving two volve problems originally identified at the Point Beach and Peach Bottom reactors, in accordance with your direction in DRO Bulletin 74-1, we have determined:
(1) No Dorling volves have been purchased or furnished for the Trojan i
Nuclear Plant, and (2) Woiworth volves are being furnished for the Trojan Nuclear Plant, which originally had design details similar to the Peach Bottom volves discussed in DRO Bulletin 74-1 (Material Requisition 6478-M114, Purchase Order N-00326). These volves are being modified prior to delivery to utilize full penetration welds at the yoke to
{
motor operator mounting plate joint.
l As a result of the determinations above, we do not anticipate any problems related to the deficiencies described in the Bulletin.
Sincerely, s
kff
^
/ Joseph L. Williams Vice President Engineering-Construction JLW:mo B. H. Grier, Assistant Director for Construction and Operations ec:
Directorate of Regulatory Operations U. S. Atomic Energy Commission Washington, D. C. 20545 f/A2/W33W
.