O [ p a tacf ; w *[k o
UNITED STATES NUCLEAR REGULATORY COMMISSION g
WASHINGTON, D. C. 20555 s ~.1)
December 31, 1980 CHAIRMAN The Honorable John D. Dingell, Chaiman Subcomittee on Energy and Power Comittee on Interstate and Foreign Commerce United States House of Representatives Washington, D. C.
20515
Dear Mr. Chaiman:
The August 18,1980 GA0 report entitled " Analysis of the Price-Anderson Act" (EMD-80-80) recommends that the Nuclear Regulatory Commission undertake technical studies to assist Congress in determining a realistic limitation on liabil.ity for nuclear accidents.
There are probabilistic risk analysis models which can be used to calculate the off-site consequences in the event of a nuclear plant accident. The Calculations of Reactor Accident Consequences (CRAC) code, from the 1975 Reactor Safety Study (WASH-1400), is used by the NRC staff to calculate reactor accident consequences, including early fatalities, early illnesses, latent cancers, and i roperty damage. This code has been improved in some respects since 1975 and is continually being revised to incorporate improvements.
For example, several computer codes, including CRAC, will be revised'to reflect the lessons learned from the Three Mile Island accident and to incorporate recent research results.
For a recent study, NUREG-0715, " Task Force Report on Interim Operation of Indian Point" (copy attached), the CRAC code was used to make risk comparisons of various reactor si.tes, reactor designs, and public protective measures.
estimated (parison, off-site risks for six different reactor sites were In that comsee NUREG-0715, p. 17). The sites considered ranged from the Indian Point site, located in the most densely populated area, to the Diablo Canyon site, which is quite remote. The property damage estimates indicate that any accident which is serious enough to require evacuation of members of the general public is likely to cost $10 to $100 million.
Accidents of this type have a calculated probability of about one in ten thousand per reactor year.
For lower probability accidents, the numbers are larger. As you know, these probabilistic estimates have wide ranges, depending on protective measures, design, sites, and uncertainties in the estimates (see NUREG-0715,p.39). Thus for a probability of 10-6 per reactor year, 810 II 30 GW
The Honorable John D. Dingell
- the estimates for early fatalities range from none to 5,000. For a probability of 10-9, estimates of early fatalities range from 700 to 50,000. Similarly the estimates for early illness range from 10 to per reactor year and from 6,000 to for a probability of 10 go-7 10,000 for a probability of 7 X Latent cancer estimates range from 800,000 none to 200 for a 10 6 probability and from 200 to 2,000 for a 10-9 probability.
Property damage estimates range from $2 million to
$2 billion for a probability of 10-6 per reactor year, and from
$8 billion to $100 billion for a probability of 10-9 (in 1974 dollars).
We have not estimated the monetary costs associated with early fatalities, early illnesses or latent cancers.
In addition to the substantial uncertainties inherent in this type of calculation, there is a suspected bias in the model for the property damage analyses which the staff believes tends to underestimate the potential costs.
The model uses criteria for interdicting the use of contaminated property and assumptions for cleanup of contaminated property which may be optimistic with respect to costs.
The GA0 report recommends that the Commission realistically define a limit of liability for the Price-Anderson Act.
As the Acting Executive Director for Operations stated in his letter to GA0 commenting on the draft report, since a decision to increase the liability limit must be made by Congress and not the Commission, the Commission believes it may be more appropriate for Congress to determine whether to increase the liability limit based on full consideration of the types of consequences which may occur following an accident (i.e., early fatalities, early illnesses, latent cancer, and property damage).
However, the Commission believes that the statutorily prescribed limits of liability should be adjusted to account for inflation.
The GA0 report also recommends that the Commission reassess the Federal government indemnity. The Commission believes that there is no objective source of information available to reassess this indemnity and that this is an area for the exercise of Congressional judgment.
Finally, in response to the recommendation that the Commission reassess the financial impact of increasing the present $5 million retrospective premium, I have attached a copy of a financial impact study completed by the staff last year which updates earlier information contained in a 1976 repcrt prepared for the Comission by Dr. Ronald Melicher of the University of Colorado, NR-A1G-003, " Financial Implications of Retrospective Premium Assessments on Electric Utilities" (copy enclosed). This report assessed the financial impact of various retrospective premiums on representative utilities. The staff study provides additional infomation in this area as well as a sensitivity analysis of the impact of increasing the retrospective premium to $20 million per reactor. This type of 4
.e-n
(
The Honorable John D. Dingell review should be required for Congress in assessing the tradeoff between the costs of requiring additional and the costs of providing power. protection through increased premiums We do not present this study as definitive, since we are not experts in the financial management of utilities.
Sincerely, t.
John F. Ahearne
Enclosures:
1.
NUREG-0715 " Task Force Report on Interim Operation of Indian Point" i
2.
NR-AIG-003, " Financial Implications of Retrospective Premium Assessments on Electric Utilities" 3.
Financial Impact Study cc:
Rep. Clarence J. Brown