Forwards Monthly Operating Rept for Dec 1980
ML19351F614
Person / Time
Site: Humboldt Bay
Issue date: 01/07/1981
From: Weeks E
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19351F615 List:
References
NUDOCS 8101130578
Download: ML19351F614 (2)


Text

0 r

PACIFIC GAS AND E LE C T RIC C O M PANY 9GW3 l

77 BEALE STREET

  • TWX 910 372 6587 JAMES HIFFER CEPARTMENT 08 NUCLE AR PLANT CPERATONS YJCLEAR POWER GENERATCN January 7, 1981 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket No. 50-133 License No. DPR-7 Gentlemen:

Enclosed are the completed monthly report forms and the narrative of operating and major maintenance experience for Humboldt Bay Power Plant Unit No. 3 (HBPP-Unit 3) for December,1980. These forms and the narrative are submitted in accordance with Section IX I.l.c of our Technical Specifications.

Sincerely E. D. Weeks Plant Superintendent Humboldt Bay Power Plant 1034 Sixth Street Eureka, California 95501 (707-443-2787)

Enclosure cc:

Mr. J. D. Shiffer Mr. R. H. Engelken, Director Directorate of Regulatory Operations Region V Office U. S. Nuclear Regulatory Commission 1990 N. California Boulevard Walnut Creek Plaza, Suite 202 Walnut Creek, California 94596 EDWeeks:me 810113 0 5-tBL

e MONTHLY NARRATIVE REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of December, 1980. This report was prepared by the Plant Staff and is submitted in accordance with Section IX:I.1.c. of the Technical Specifications.

During the report period the reactor remained in the cold shutdown mode of operation. There were no significant events associated with the operation of the Unit. There was no significant maintenance completed during the month.