ML19351F518

From kanterella
Jump to navigation Jump to search
Forwards LER 80-091/01T-0
Date released: 12/31/2019 Download: ML19351F518


LER 80-091/01T-0:on 801223,during Analysis Per IE Bulletin 80-11,design for Block Wall Between Control Room & Stairway AB-1 Found to Be Less Conservative than Assumed in Fsar. Caused by Outdated Analytical Const Methods
ML19351F519
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/06/1981
From: Mekbel C
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19351F519 (3)
Forwards LER 80-091/01T-0
ML19351F517
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/06/1981
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19351F517 (1)