Suppls Response to Items 2(b) & 2(d) of IE Bulletin 80-08, Examination of Containment Liner Penetration Welds. Forwards Summary of Radiographic Test Results,For Containment Piping Penetrations
ML19351F412
Person / Time
Site: Rancho Seco
Issue date: 12/05/1980
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
IEB-80-08, IEB-80-8, NUDOCS 8101120553
Download: ML19351F412 (2)


Text

$l s e O S ". U '.z.

9 u

SACRAMENTO MUNICIPAL UTILITY DISTRICT C 6201 S straet, Box 15830, Sacramento, California 95813; (916) 452-3211 h

3 C.c, h p-

._ m Docket 50-312 December 5, 1980

+

cv @

Mr. R. H. Engelken, Director

-g Region V, Office of Inspection and Enforcement U.S. tiuclear Regulatory Commission Suite 202, Walnut Creek Plaza 1990 fiorth California Boulevard Walnut Creek, CA 94596 IE Bulletin 80-08 Examination of Containment Liner Penetration Welds

Dear Mr. Engelken:

As a follow-up to the District's response to Items 2b and 2d of IE Bulletin 80-08, concerning the containment piping penetration welds, we have reviewed our records and found that, in addition to the liquid _ pene-trant and helium leak testing, radiography was also performed. The attached

" Summary of Radiographic Test Results" contains the results of construction nondestructive examination for those welds which required repair.

Should you have any questions, please contact Larry Smith on (916) 452-3211, extension 621.

Sincerely, b

fmWNL n

John J.11attimoe Assistant General Manager and Chief Engineer 3

-Attachment 9.i.

cc: Di rector E

h; e

c Division of Construction Inspection w

QY U.S. fiuclear Regulatory Commission 4:.'

4 Washington, D.C.

20555 6~)2 g

'9 "Si S..

g h

N

/

810 1120553

~

n, A N ~ E LICT Ric S Ys T E M S E PVIN G M o R E ' T H A N 6 0 0. 0 0 0'- I N T H E ~~ H E A R T ' o F ' Att 0 J,

1

hUbhf.2.h'.JhMW3!!k lilF'lI h lf[

Containecnt Piptog Penetration Welds Requiring Repair

h wtra tten Criginil Repair 3 or t.w

.'el d (Je f ec t s Repair 1 Repair 2 Repair 4

, M Repair 5 Repair 6 ISP-2 1/4" Porasity Cluster (SP-10 1" Slag Inclusion 1/4" Slag Inclusion R-2 OK 1/4" Slag Inclusion 1/2" Slag Inclusion f*,pgl s

vq 'M 1/4" Slag-Inclusion 1" Inccmplete Fusion N

l 1/2' Slag & Porosity Cluster ej,Q. '

o t.

1/4" Slag Inclusten

,. $/

1" (Total) Slag Inclusion m PP e

3" inccmplete fusion ISP-17 3" Concave Poot 1" Concave Root 2* Incomplete Fusio-tio 1" Cencave Root, OK 3" (Total) Coicave Root.

3" Intermittent R-3 or R-4 Slag & Tungsten O,

Inccrplete fusion, &

Incomplete fusion Reported inclusions Tungsten Inclusion (SP-19 5 srall clusters Porosity Accepted (3" Total Lenqth) 1" Perosity & (Jndercut 1/8" rerosity a tJndercut 4" Scattered Porosity g

ISP-22 1" Cencave Root Accepted 9" Internittent Concave Root 3" Concave Rcot 1" Concave Root a

ISP-29 1/4" Incceplete Fusion OK TSP-43 1/2" Incomplete Penetration

' ' Incorrplete fus' ion Accepted SP-48 1* Incomplete Penetration O

SP-52 10* liigh-l.cw 6" Surface Roughness 12" Surface Roughness (Reported OK)
SP-56 Incomplete Fusion (Entire Weld Apparently

}

Replaced) v ISP-58 1/2" Concave Root 3/4" Concave Root tio R-2 Reported R-3 OK

Sh-65 2" Drop-through 3/4" Drop-through R-2 CK v

4 n

.,