ML19351F278
| ML19351F278 | |
| Person / Time | |
|---|---|
| Site: | Surry, North Anna |
| Issue date: | 12/22/1980 |
| From: | Sylvia B VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 667A, IEB-80-18, NUDOCS 8101120120 | |
| Download: ML19351F278 (1) | |
Text
l rh E
- 'NRO REf_@fi.
VIROINIA Er.ECrRIC AND Power COMPANY ' *!
- 1 Ricarwonn,VxBOINIA 20261 VI n.
] [ EM9-SU 4b
-1 December 22, 1980 h
<.a b.
i u
Mr. James P. O'Reilly, Director Serial No. 667A Office of Inspection and' Enforcement N0/DWL:ms U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Region II 50-281 l
101 Marietta Street, Suite 3100 50-338 ]
I Atlanta, Georgia 30'.i03 0-339 )
License Nos. DPR-32 DPR-37 NPF-4 NPF-7 l
Dear Mr. O'Reilly:
SUBJECT:
COMPLIANCE WITH I.E. BULLETIN 80-18 COMMITMENTS l
In our response to I.E.
Bulletin 80-18 (Serial No. 667 dated Septeraber 26, 1980) it was stated that corrective action in the form of equipment and proce-dure modifications was scheduled to be completed by December 1,1980.
The actual completion dates were December 5,1980 for the Surry Power Station Units and December 3, 1980 for the North Anna Power Station Units.
This commitment would most likely have been met except for a last minute concern regarding the safety analysis associated with the proposed design change.
This last minute concern was identified by our System Nuclear Safety and Operating Committee and resulted in a five (5) day delay in the approval of the Design Change Package.
If you have any questions or require additional information, please contact this office.
Very truly yours,
/ n.
A B. R. Sylvia Manager - Nuclear Operations and Maintenance cc: Director, NRC Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D. C.
20555 Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 Division of Licensing 810?: L O/SO g