ML19351F010

From kanterella
Jump to navigation Jump to search
Forwards Trip Rept of 800707-10 Site Visit Re Review of Seismic Qualification Methods,Procedures & Results for Mechanical & Electrical Equipment
ML19351F010
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/28/1980
From: Kintner L
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8012190723
Download: ML19351F010 (2)


Text

TERA

,,(

y'3eq(%

4 UNITED STATES g

NUCLEAR REGULATORY COMMISSION

.'- ~* /. E WASHINGTON, D. C. 20555

%,, +Ib /

Docket No. 50-364 APPLICANT: Alabama Power Company FACILITY:

Joseph M. Farley Nuclear Plant, Unit 2

SUBJECT:

SUMMARY

OF JULY 7 THROUGH JULY 10, 1980 MEETING REGARDING REVIEW 0F OPERATING LICENSE APPLICATION The Seismic Qualification Review Team for Farley 2 (C. Hofmayer, A. Lee, P. Y. Chen) met with the applicant at the Farley Nuclear Plant to conduct a plant site review of the seismic qualification methods, procedures and tsults for mechanical and electrical equipment.

Field installations of the equipmr.nt was observed as a part of the review. The report of the site review is enclosed.

-f l'

/

1

\\*

W Lester L. Kintner, Project Manager Licensing Branch No. 2 Division of Licensing

Enclosure:

As stated l

cc: See next page l

l 8012 rs o 743

[

l l

s Mr. F. L. Clayton, Jr., Senior Vice President Alabama Power Company Post Office Box 2641 Birmingham, Alabama 35291 cc: Mr. W. O. Whitt Executive Vice President Alabana Power Company Post Office Box 2641 Birmingham, Alabama 35291 Fe, Ruble A. Thomas

' lice President Southern Company Services, Inc.

Post Office Box 2625 Birmingham, Alabana 35202 i

Mr. George F. Trowbridge Shaw, Pittman, Potts and Trowbridge 1800 M Street, N. W.

Washington, D. C.

20036 Mr. W. Bradford NRC Resident Inspector P. O. Box 1814 Dothan, Alabama 36302

,-,~.r

- -,... ~. - - -

r

-- ~.. - - -

r

jj

1. f8 b %---

n arc UNITED STATES NUCLEAR REGULATORY COP. ".11sslON

} ] ft 3

"i ASHINGTON, D. C. 20$51

, n -e/ 2 sA

%../

  • l OCT 01150 MEMORANDUM FOR: Zoltan R. Rosztoczy, Chief Equipment Qualification Branch Division of Engineering FROM:

Arnold Lee Equipment Qualification Branch Division of Engineering THRU:

Charles H. Hofmayer, Section Leader Equipment Qualification Branch Division of Engineering

SUBJECT:

TRIP REPORT FOR SEISMIC CRITERIA IMPLEMENTATION REVIEW MEETING WITH ALABAMA POWER COMPANY ON FARLEY 2 NUCLEAR GENERATING STATION The Seismic Qualification Review Team (SQRT) made a site visit to Farley 2 Nuclear Generating Station at Dotham, Alabama, on July 7-10, 1980. The purpose of the visit was to conduct a plant site review of the qualification methods, procedures, and results for thirty four selected BOP Seismic Category I mechanical and electrical equipment, and their supporting structures. The intention was also to observe the field installations of the equipment, based on which judgements can be made on the validity of the equipment modelling employed in the qualification program, with respect to the equipment con-i figuration and its mounting condition.

A list of attendees is contained in Attachment I.

The thirty four pieces of equipment which were selected for the plant site review are listed in Attachment II. The objectives, review procedures, findings and conclusions of the meeting, and the required follow-up actions are summarized as follows:

I.

Objectives In the Safety Evaluation Reoort (SER) dated May 2,1975, we stated that the Farley 2 B0P equipment qualification complied with IEEE 344-1971.

The licensing criteria with since publication of Standard section references IEEE Stand The principal change in our c DUPLICATE DOCUMENT equipment multi-mode response these changes we considered i Entire document previously equipment qualification progr entered into system under:

the original tests and analys N l() MD M9 Westingnouse equipment for th ANO multi-mode response and multi adequately qualified. There-No. of pages:

hk qualification of B0P electric 1

JLD d

goicgd_.Of C,

u

-