Informs NRC That Leakage Measurements Required by Task Action Plan Item III.D.1.1 Will Be Made Before Full Power Operation.Test Results Will Be Provided within 30 Days of Completion.Test Procedures Have Been Transmitted
ML19351E735
Person / Time
Site: Sequoyah 
Issue date: 12/15/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8012190125
Download: ML19351E735 (1)


Text

TENNESSEE VALLEY AUTHORITY CH AT T A NOOG A. T EN N ESS E E 37 401 400 Chestnut Street Tower II j

December 15, 1980

~

E

,t if ggo' m

Director of Nuclear Reactor Regulation y

S

]..

Attention:

Mr. A. Schwencer, Chief y

u

,J r

Licensing Branch No. 2 O

Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Schwencer:

In the Matter of the Application of

)

Docket No. 50-328 Tennessee Valley Authority

)

My letter to you dated July 3,1980, transmitted TVA's response to Task Action Plan Item III.D.1.1, Integrity of Systems Outside Containment Likely to Contain Radioactive Material, for Sequoyah Nuclear Plant.

In addition, leakage measurements are required by this item for Sequoyah unit 2 systems that contain primary coolant outside containment. These measurements will be made before operation at full power. The test results will be provided for NRC review within 30 days of the com-pletion of the tests. Testing procedures and the results of the radwaste system tests have been transmitted to you by my letters dated July 11 and September 22, 1980.

Very truly yours, TENNESSEE VALLEY AUTHORITY

). M' d L. M. Mills, Manager Nuclear Regulation and Safety Sworn to and subscri ed before me this-,[

day of X N L?

1980 L fri-, e

/, /

WL Notary;Public fj My Commission Expires //.

3v

/,/

An Equal Opportunity Employer as