ML19351E720

From kanterella
Jump to navigation Jump to search
PNO-TMI-80-53:on 801208,util Issued Press Release Stating That Claim of Four Billion Dollars Was Filed Against NRC for Neglience Re Performance Before TMI-2 Incident & Based on Estimated Cost of TMI-2 Cleanup
ML19351E720
Person / Time
Site: Crane  
Issue date: 12/08/1980
From: Jay Collins, Conte R, Shanbaky M
Office of Nuclear Reactor Regulation
To:
References
PNO-TMI-80-053, PNO-TMI-80-53, NUDOCS 8012190092
Download: ML19351E720 (2)


Text

-

PREllMINARY NOTIFICATION December 8, 1980 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-TMI-80-53 This preli inary notification constitutues EARLY notice of events of POSSIBLE safety m

or oublic interest significance.

The information Dresented is as initially received without verification or evaluation and is basically all that is known by NRC staff -

on this date.

Facility: Metropolitan Edison Company

~

Three Mile Island, Units 1 & 2 Middletown, Pennsylvania Docket Number s 50-289 & 50-320

= ~;

m

Subject:

GENERAL PUBLIC UTILITIES (GPU) F.ILES CLAIM AGAINST NRC 3

=

v, Today GPU issued a press release stating that a claim of $4 billion was filed against the NRC. The filing charges the NRC with negligent performence and omissions of its operational functions; negligent failure to comply with its own regulations; negligent failure to give warning based on the (Taledo Edison)

Davis-Besse incident that occurred in September 1977; negligent.ir? ementation l

of review and approval requirements; and regligent review and approval of Babcock & Wilcox Co. topical reports and generic designs.

The claim is based on estimated cost of the TMI-2 cleanup; recovery of replacement power costs for both TMI-1 and 2; estimated cost of TMI-2 restoration; cost of lost revenues; and increased cost of borrowing.

Region I is responding to media interest because of licensee issuance of a press release. The NRC has no plans to issue a press release at this time. The Commonwealth of Pennsylvania has been informed.

This preliminary notification is issued for information only.

The NRC TMI Program Office received notification of this occurrence by telephone at approximately 9:00 a.m. from the licensee public affairs of fice, and this information was current as of 12:00 p.m.

O%

kkr

Contact:

R. Cohte 590-1125 M. Shanbaky 590-1140

. Col 1 ins 590-1120 l

l l

8012r90 @

Id

PNO-TMI-80-53 (cont) 2 December 8, 1980 DISTRIBUTION:

(Facsmile Transmission Times Noted) j H ST BLDG /f_i/1P MARYLAND NATIONAL IE:X00S J*5'$F Chairman Affearne BANK BUILDING _ 2:o6 (IE:HQ Dist)

Commissioner Gilinsky W. J. Dircks. EPO~

Commissioner Bradford C. Michelson, AE0D Region I

"):14l Commissioner Hendrie J. J. Fouchard, PA Region II Jt ps-ACRS N. M. Haller, MPA Region III jpise S. J. Chilk, SECY G. W. Kerr, OSP Region IV et gr/

C. C. Kammerer, CA H. K. Shapar, ELD Region V _;E.): j2nd PHILLIPS BLDG J/ ?ji_

WILLSTE BLDG f

  • 17 7 (MAIL)

'I. Denton, NRR J. G. Davis, NNSS lE:XOOS R. H. Vollmer, NRR T. Murley, RES Document Mgt. Br.

F. Schroeder, NRR S. ~ Ebbin, NSOC D. F. Ross, NRR LANDOW BLDG (Fax by HQ)

D. Eisenhut, NRR (6 MIN /PAGE)

S. H. Hanauer, NRR J. J. Cummings, 01A B. J. Snyder, NRR PRELIMINARY NOTIFICATION L

a

c

-