MONTHYEARML24241A1922024-08-27027 August 2024 October 2024 Emergency Preparedness Program Inspection - Request for Information ML24159A2672024-06-0707 June 2024 NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Licensee Amendment Request (LAR) to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program ML24137A2702024-05-16016 May 2024 NRR E-mail Capture - Entergy Fleet - Acceptance Review of License Amendment Request to Remove Obsolete License Conditions from Operating Licenses for GGNS, RBS, and WF3 (L-2024-LLA-0062) ML24115A0862024-04-23023 April 2024 NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML24115A0882024-04-23023 April 2024 NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23097A0412023-04-0606 April 2023 June 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23076A0552023-03-13013 March 2023 EP Program Inspection RFI Hjs 10132022 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23052A0882023-02-17017 February 2023 Inspection Request for Information ML22336A0202022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Revise Technical Specification 3/4.3.2 ML22335A4802022-12-0101 December 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22329A0152022-11-0202 November 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22290A0442022-10-13013 October 2022 December 2022 Emergency Preparedness Program Inspection - Request for Information ML22215A1492022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Permit the Use of Risk-Informed Completion Times in Accordance with Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2 ML22215A2062022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Adopt Title 10 of the Code of Federal Regulations, Section 50.69: Loe and Completion Date Update ML22206A0172022-07-22022 July 2022 NRR E-mail Capture - Request for Additional Information: Waterford 3 - License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 ML22206A0152022-07-21021 July 2022 NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems ML22209A1082022-07-15015 July 2022 NRR E-mail Capture - Draft RAIs to License Amendment Request for Application to Adopt 10 CFR 50.69 and Revise Technical Specifications to Adopt TSTF-505, Revision 2 ML22144A1662022-05-24024 May 2022 PI&R Request for Information and Transmittal e-mail ML22108A1792022-04-14014 April 2022 WF3 Cpcs Installation Inspection Plan Email ML22209A1062022-01-20020 January 2022 NRR E-mail Capture - (External_Sender) Options Moving Forward Regarding Waterford TSTF-505 and 50.69 ML22209A1052022-01-0606 January 2022 NRR E-mail Capture - Estimate for Completion of 50.69-TSTF-505 Peer Review ML22012A1592022-01-0505 January 2022 WF3 2022 EP Exercise Inspection RFI Sdh 010522 ML21356A5872021-12-22022 December 2021 NRR E-mail Capture - Acceptance for Review: Waterford 3 - Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML21349A2242021-12-14014 December 2021 NRR E-mail Capture - (External_Sender) Waterford 3 - Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial EP Exercise ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21280A0812021-10-0505 October 2021 Email 10-5-21 - Request for Information_ Waterford EP Inspection (71114.04 & 71151) - Nov-Dec 2021 ML21285A0242021-10-0505 October 2021 Digital Instrumentation and Control Modification Inspection Request for Information ML22112A1512021-08-0606 August 2021 NRR E-mail Capture - for Review: Draft RAIs to LAR to Relocate Chemical Detection Systems Technical Specifications (TS) to Technical Requirements Manual (TRM) ML21216A4562021-08-0404 August 2021 WF3 2021 EP Exercise Inspection Request for Information (RFI) ML21218A0402021-07-26026 July 2021 NRR E-mail Capture - Final RAIs to Entergy Operations, Waterford Steam Electric Station, Unit 3 LAR to Adopt 10 CFR 50.69 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21173A1082021-06-22022 June 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Adopt TSTF-563 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21160A0852021-06-0404 June 2021 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Louisiana Regarding a Waterford Steam Electric Station, Unit 3 Amendment - Digital Upgrade I&C ML21145A0062021-05-24024 May 2021 NRR E-mail Capture - Supplement Received - Waterford Unit 3 - License Amendment Request for Boration Systems Tech Specs ML21120A1192021-04-30030 April 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - LAR to Relocate Chemical Detection TSs to TRM ML21105A0512021-04-14014 April 2021 4-14-21 Email - RFI for In-Office Inspection of Recent WF3 Submission of EAL Procedure Revision ML21104A0382021-04-13013 April 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request for TSTF-505 ML21084A2552021-03-22022 March 2021 NRR E-mail Capture - Supplement to Audit Plan Dated October 1, 2020 (Waterford 3, L-2020-LLA-0164) ML21088A1512021-03-15015 March 2021 NRR E-mail Capture - Draft Waterford Acceptance Review Letter for TSTF-505 LAR ML21069A1842021-03-0202 March 2021 NRR E-mail Capture - Announcement of QA Inspection ML21040A3892021-02-0808 February 2021 NRR E-mail Capture - Announcement of QA Inspection ML21039A6412021-01-28028 January 2021 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford 3 50.69 LAR ML21022A1692021-01-22022 January 2021 NRR E-mail Capture - Entergy Fleet (ANO, Grand Gulf, River Bend, and Waterford) - Acceptance Review for RR EN-20-RR-003, Proposed Alternative to Use ASME Code Case N-711-2 ML20329A1442020-11-20020 November 2020 Terrapower QAPD Preliminary Questions Email 2024-08-27
[Table view] |
Text
Alexander, Ryan From: Alexander, Ryan ADAMS No. ML19351E677 Sent: Tuesday, December 17, 2019 3:08 PM To: jbradl3@entergy.com Cc: Dixon, John; Ramirez, Frances; Speer, Chris
Subject:
REQ: RFI for IP 92702 NOV Follow-Up Inspection - Jan 21-23, 2020 Attachments: RFI for 92702 Follow-Up Inspection.pdf Mr. Bradley:
Per our telephone conversation on December 4, 2019, attached is the Request for Information (RFI) to support the inspection the NRC will conduct at Waterford Station, Unit 3, the week of January 21, 2020. As discussed the inspection will utilize NRC Inspection Procedure IP 92702, to follow-up on the Notice of Violation EA-18-020, which was documented in Inspection Report 05000382/2017009. The results of this inspection are anticipated to be documented in the 1st quarter integrated inspection report (IR 2020001).
As we discussed, I appreciate the information requested in the attached be made available via electronic means deemed acceptable to Entergy/Waterford Station (e.g., online document portal) by Monday, January 13, 2020, to support preparation activities prior to the onsite inspection. If the station has any concerns/questions regarding the requested information or response timeline, please contact me promptly at the office number listed below.
Finally, in accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this email and its attachment will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Ryan D. Alexander Senior Project Engineer U.S. Nuclear Regulatory Commission, Region IV Division of Reactor Projects Office: (817) 2001195 Please consider the environment before printing this email.
1
RFI for IP 92702 NOV Follow-Up Inspection for Notice of Violation EA-18-020 Documented in Inspection Report 05000382/2017009 Docket: 050000382 (Waterford 3); Inspection Report: 2020001 Please provide the following information via electronic means deemed acceptable to Entergy/Waterford Station (e.g., online document portal), by Monday, January 13, 2020.
- 1. Current revision of FLEX Program Document (may also be known as the Final Integrated Plan, as updated)
- a. Please include the change packages which evaluated the changes from prior versions in accordance with NEI 12-06, Rev. 0, Section 11.8.3.
- 2. All Cause Evaluation(s) completed to address the cause(s) of the performance deficiency and associated Notice of Violation (NOV)05000382/2017009-01.
- 3. Objective evidence of all corrective actions completed associated with the Cause Evaluation(s) provided for RFI #2, including all corrective actions referenced in:
- a. NOV Response W3F1-2018-0056, dated September 12, 2018 (ADAMS Accession No. ML18255A321), and
- b. Reply to NOV Supplement W3F1-2019-0033, dated May 17, 2019 (ADAMS Accession No. ML19137A341)
- 4. Engineering/Modification Change package(s) associated with the relocation and operation of the FLEX N+1 Diesel Generator (DG) to the Q-deck.
- 5. Current revisions of the following procedures/guidelines:
- a. Waterford FLEX Support Guidelines (FSGs) which reference the deployment and/or operation of the FLEX N+1 DG
- b. Waterford Operator Aids/Hard Cards/Staged Instructions in place for operation of FLEX N+1 DG
- c. Emergency Operating Procedures (EOPs) which refer to the use of the FLEX N+1 DG (if any)
- d. FLEX Implementing Guideline for Extended Loss of All AC Power
- e. Procedure(s) in place to prepare for and in response to severe weather (e.g., EN-FAP-EP-010, OP-901-521, etc.)
- 6. Current revision of the section of the Waterford Technical Requirements Manual which addresses FLEX equipment (e.g., TRM 3.13)
- 7. Complete corrective action documents as noted below, unless already provided in response to one of the above RFIs:
- a. CR-WF3-2017-09150
- b. CR-WF3-2017-09152
- 8. If there are any testing or surveillance activities planned associated with the N+1 FLEX DG while the inspector is onsite (January 21-23, 2020), please inform the inspector of the time/date of the planned activities, and provide any associated work packages/procedures to be completed as a part of testing/surveillance activities. [If no such activities are planned for the time period in question, please only state as much in your response.]
PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.