ML19351E608

From kanterella
Jump to navigation Jump to search
Forwards LERs 80-038/03L-0 & LER 80-039/03L-0. LER 80-039/03L-0 Not Encl
Date released: 12/31/2019 Download: ML19351E608


LER 80-038/03L-0:on 800712,bistable Associated W/Pressurizer Pressure Transmitter 457 Failed to Meet Low Pressure Trip Setpoint Requirements & One Pressure Channel Declared Inoperable.Caused by Dirty Electric Contacts
ML19351E612
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/08/1980
From:
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19351E612 (1)
Forwards LERs 80-038/03L-0 & LER 80-039/03L-0. LER 80-039/03L-0 Not Encl
ML19351E607
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/08/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19351E607 (1)