,. 4~9 927 I YANKEE NUCLEAR POWER STATION OPERATION REPORT NO. 123 g
"a pf Iffi 'g For the Month of ps "f
gj #p' d,ig'>fr j:v
' U! C,
March 1971 L;
\\.~J
,: :~
v
\\.A f;.
v 6,K, '
\\/s '
4~ -
N'yl';n_,tyn/ j ie K
/.
s
'QW Submitted by YANKEE ATOMIC ELECTRIC COMPANY Westboro Massachusetts April 22, 1971 i
O '
2 -
b' (*
Ff g
g
- m, r
O This report covers the operation of the Yankee Atomic' Electric Company at Rove, Massachusetts for the month of March, 1971.
At the beginning of the report period, plant load was 485 MWt, following the planned February 27-28 reactor shutdown.
At 0540 hours0.00625 days <br />0.15 hours <br />8.928571e-4 weeks <br />2.0547e-4 months <br /> on March 1, plant load was 540 MWt and at 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> the same day the plant i
l vs loaded to'600 MWt.
During the balance of the period plant load varied between 184.1.MWe and 185.2 MWe as the circulating water' inlet temperature
-fluctuated between 39 F and 33 F.
![
The second, Core IX vapor container air leakage surveillance period was terminated at 2h00 hours on March 31., with normal leakage nc ed.
Plant Abnormal Occurrences l
There were no plant abnormal occurrences during the report period.
l Plant Load Reductions l
-March 10 (1200-1240):
Load reduction to 177 MWe for control valve exercising.
March 17 (1145-1230):
Load reduction' to 177 MWe for control valve exercising.
March 24 (1150-1220):
Load reduction to 17T MWe for control valve O
exercising.
March 31 (llh5-1330):
Load reduction to 140 MWe for throttle valve I
exercising.
Plant Shutdowns f
I 1
There were no plant shutdowns during the report period.
l 2
P] ant Maintenance
)
The following is a list of pertinent maintenance items performed l
by the plant staff during the month of March, 1971.
{
t I
1.
The No. 3 charging pump was repacked.
i 2.
As. a result of inspection of the No.1 service water pump, its upper -
i shaft was sent off-site for preventive maintenance.
3.
The discharge line relief valve for the No. 3 charging pump was
{
replaced.
i I
i
' S 4
i I
l r
w.,__
.... ~.
! ~ -.
t =,
i l
G Instrumentation'and' Control-l The 'fo11owing is' a -list -of pertinent instrumentation and. control maintenance items performed by the plant staff during the month of March 1971.
l ~
~1.
Installation of the atmospheric ~ temperature gradient teasuring system l-
-has been completed; and,the system is now operational.
j
~
Y 2.
A new system of_ illumination was' assembled for utilization with closed
.l
-circuit television in' confined dry areas.
Reactor Plant Performance The following parameters were determined by means of incore instrumentationt 599 0 MWt; 526.2 F Tavg; Cor.crol Rod Group A @ 81, B,C,D @ 87 ;
1022 ppm boron.
L.j' F
2.1
=
q
-F H t
Minimum DNBR = 3.3 Maximum Outlet Temperature = 586.0 F t.'
Secondary Plant Performance Feedwater heater terminal differences were as follows:
5.6 F-No. 2 6.3 F No. 3 6.5 F No. 1
=
=
=
The condenser performance vr.s as follows:
- 184.6 MWe; 1.10" Hg. B.P. ; 598.0 MWt; 36.0 F C.W. in; TTD = 26.06 F; cleanliness factor = 90.8%.
Chemistry The main coolant boron concentration was reduced from llh0_ ppm to 918 ppm to compensate for normal core depletion.
The main coolant pH averaged.5.21 during the period.
The main coolant beta-gamma specific activity and crud level averaged 1.12 x 10-1 ue/ml and 0.01 ppm, respectively, during the period.
During the report period the main coolant tritium concentration
. averaged h.0h uc/ml.
G 9
7-
- - _ _ _ - - - _... ~ _.. _ _
l The iodine-131 specific activity averaged 5.39 x 10- uc/ml and
~
G the' iodine 131/133 atomic ratio averaged 2.19, values consistent with the
'l previous report, thereby indicating no significant change in the magnitude of fuel. clad defects during the current. period.
i A crud sample for the month collected on March 8, had the I
following radiochemical analyses: dpm/mg crud Cr-51 7 Mn-5h Fe-59 5
6 l.h2 x 10 5.43 x 10 h.02 x 10 l
Co-58 6
Ag-110M 6
5 5.66 x 10 1.29 x 10 9.96 x 10 A main coolant gas sample, collected on March 23, had the following
' radiochemical analyses: -ue/cc gas Xe-133 Xe-135 Ar-bl r
-1
-1 1.05 1.89 x 10 h.30 x 10 i
Health and Safety l
Waste disposal liquid releases totalled h7,195 gallons containing l
0.014 me of gross beta-gamma activity and 179 00 curies of tritium. Gaseous i
releases during the period totalled 1.078 curies of gross beta-gamma activity
[
and 0.72 me of tritium activity. Secondary plcnt water discharged totalled j
9 505,609 gallons. containing 0.031 ne of gross beta-gamma activity and 2.172 curies of tritium.
Radiation exposure doses for Yankee plant personnel as measured by film badge for the month of March,1971 vere as follows:
i Average accumulated exposure dose: 68 mrem Maximum accumulated exposure dose:390 mrem Operations Attached is a summary of plant operating statistics and a plot of daily average'lcad for the month of March, 1971.
i
!t O
1 l
4 9
~
G i
l 4
i YANKEE ATOMIC ELECTRIC COMPANY - OPERATI?M SUV. MARY l
March 1971 i
-t ELECTRICAL MONTH YEAR TO DATE
.]
i Gross Generation KWH 137,0h9,000 392,262,800 11,886,134,100 i
Sta. Service (While Gen. Incl. Losses)
KWH 8,214,480 23,h55,268 771,480,293 i
)
Net Output KWH 128,834,520 368,807,532 11,116,653,807
[
j' Station Service
'5.99 5.98 6.49 l
Sta. Service (While Not Gen. Incl. Losses) KWH 0
193,583 32,482,438 l
Ave. Gen. For Month (744)
KW 184,205.6 Ave. Gen. Running (744)
KW 18h,205.6
?
I PLANT PERFORMANCE i
i
}
Net Plant Efficiency 29.04 28.99 28.50 j.
Het Plant Heat Rate btu /KWH 11,752 11,772 11,975 j
Plant Capacity Factor 99.40 98.18 75.65 j'
Reactor Plant Availability 100.00 98.81 84.31 1
NUCLEAR MONTH CORE IX TOTAL Hours Critical HRS 7h4 2,945.81 77,910.21 Times Scra=med 0
1 62 Burnup i
Core Average M4D/MfU 890.00 3,448.17 Region Average M4D/KfU A (INNEP) 867.38 3,295.87 20,h99.54 B (MIDDLE) 1,053.54 h,078.69 12,820.5h C (OUTER-)
729.18 2,85i.52 2,834.52 D (ZIRCALOY)
I
w YAl%EE ATOMIC E COMPANY x
s s
DAILY AVEP. AGE IDAD
~
for March 1971
~
200 m
6 O
~
150 -
a
~
=
8 100 -
M Wa m
50 -
4 W
m 0
j i
i i
4 l 1
i e
i I
i i
i i
j i
i a
i l
i 1
i i
l i
i i
i 5
10 15 20 2$
30 DAYS
" ~
~
CC+
x o
.u s
A B
C D
E F
G H
J K
y XXXX 2,N /N.
v a,
v e
N /Nr XX X X.
/
N/\\/
/N)N
/N /N
\\/
4
- o z.2X
'# M X A vv
/N/sz v
N
/N /N
- 'o XX XX
- 4
/XX X><N f
/
/
/Y RE'GIO N 79 N
N N/N eunicuucur h
A 4.94 1
.o j
e n.on
- v i
C 4.94*/,
.