4 UNITED STATES
-]
NUCLEAR REGULATORY COMMISSION 3
5 WASHINGTON, D. C. 20555 4
\\...../
_2 4 19Br) z.
Docket Nos. 50-498
- c.
and 50-499 2
_ " y, a
a
~$
5
'El Mr. Karl Seyfrit, Director Region IV Nuclear Regulatory Commission 661 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
Dear Mr. Seyfrit:
SUBJECT:
QUALITY ASSURANCE REQUIREMENTS FOR THE INSTALLATION, INSPECTION AND TESTING 0F STRUCTURAL CONCRETE AT THE SOUTH TEXAS PROJECT (STP)
By letter of October 31, 1980, Houston Lighting and Power (HL&P) transmitted its
" Revised Quality Assurance Program Descriptions and Response to NRC questions."
Contained in this document (pages 52-54) is HL&P's commitment to meeting quality assurance requirements for the installation, inspection and testing of structural concrete. With the exceptions noted in note 1 beginning on page 53 of the document HL&P connits itself to conplying with ANSI N.45.2.5-1974, " Supplementary Quality Assurance Requirements for Installation, Inspection and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants."
The staff has reviewed this connitment concerning concrete placement by HL&P and finds it satisfactory for continuation of construction at the STP.
Formal staff approval of the entire QA program will be documented, as appropriate, after canplete review of the October 31, 1980, submittal from HL&P.
Sincerely, W
~ Robert L. Tedesco, Assistant Director for Licensing Division of Licensing cc: Service List Thornburg, ISE Shewmaker, I&E Seidle, Region IV O
1
/
Mr. G. W. Oprea, Jr.
Executive Vice President Houston Lighting and Power Company P. O. Box 1700 Houston, Texas 77001 cc:
Mr. D. G. Barker Richard W. Lowerre, Esq.
Manager, South Texas Project Assistant Attorney General Houston Lighting and Power Company Environmental Protection Division P. O. Box 1700 P. O. Box 12548 Houston, Texas 77001 Capitol Station Austin, Texas 78711 Mr. M. L. Borchelt Central Power and Light Company Shannon H. Phillips P. O. Box 2121 Resident Inspector / South Texas Project Corpus Christi, Texas 78403 c/o U. S. i;RC P. O. Box 910 Mr. R. L. Hancock City of Austin Bay City, Texas 77414 Electric utility Department Mr. R. Jacobi P. O. Box 1038 Austin, Texas 78767 Houston Lighting and Power Company P. O. Box 1700 Mr. J. B. Poston Houston, Texas 77001 Assistant General Manager for Operations' Pat Coy City Public Service Board P. O. Box 1771 Citizens Concerned About Nuclear Power 5106 Casa Oro San Antonio, Texas 78296 San Antonio, Texas 78233 Jack R. Newman, Esq.
Lowenstein, Newman, Axelrad & Toll 1025 Connecticut Avenue, N.W.
Washington, D.C.
20036 Melbert Schwarz, Jr., Esq.
Baker & Botts One Shell Plaza Houston, Texas 77002 Mr. J. R. Geurts Brown & Root, Inc.
P. O. Box 3 Houston, Texas 77001 Mrs. Peggy Buchorn Executive Director Citizens for Equitable Utilities, Inc.
Route 1, Box 1684 Brazonia, Te::as 77422 9
e 9
L