Submits Info in Response to NRC 800905 Request & to Meet Requirements of NUREG-0654, Criteria for Preparation & Evaluation of Radiological Emergency Plans & Preparedness in Support of Nuclear Power Plants
ML19351D849
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 11/14/1980
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0654, RTR-NUREG-654 NUDOCS 8011200189
Download: ML19351D849 (3)


Text

l e ) kNW

$0lNhh m - n.,%

3 d Power

~ -OW""

i Cornpany aamvannu

}gh}

General Offices: 212 West Michigan Avenue,.*sckson, Michigen 49201 * (517) 788-0550

~ 'M Hovember lh, 1980 i N' itERYi25 4

Director, Nuclear Reactor Regulation Att Mr Dennis M Crutchfield, Chief Operating Reactors Branch No 5 US Nuclear Regulatory Commission Washington, DC 20555 60CKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - EMERGENCY PLAN SUBMITTALS AND ADDITIONAL INFORMATION AND REQUIREMENTS 2 reference to your letter dated September 5,1980 the following information is provided to answer your comments and requests, and to meet the requirements of NUREG-065h, " Criteria for Preparation and Evaluation of Radiological Emer-gency Plans and Preparedness in Support of Nuclear Power Plants". Revision 60 to the Big Rock Point Plant Site Emergency Plan includes corrections for the deficiencies noted by the staff as indicated below and will be sulmitted and implemented by December 1,1980 as agreed upon with Mr Walter Paulson of your staff.

COMMENT A The letters of agreement with various offsite agencies have been updated and will be included in Revision 60.

COMMENT B The Big Rock Point Plant Site Emergency Plan and, in particular, the plan's implementing procedures detail all immediate action assignments in the event of an emergency.

In all cases we believe the present minimum shift complement is adequate to satisfy the imnediate action needs of Table B-1 of NUREG 065h.

For exorple, the Site Emergency Director is assigned communication responsibi-lity and the Auxiliary Operators are assigned radiation monitoring duties pend-ing the arrival of the dedicated communicator and chemical and radie. tion pro-tection technicians. Further, neither the plan or its procedures contain any immediate action requirements that can not be performed by onsite personnel.

However, because of our relatively small off-shift complement as referenced by NRC, Region III letter to Consumers Power Company of June 13, 1980 transmitting the results of your Health Physics Appraisal and our aubsequent response to Region III of July 18, 1980, Consumers Power Company has established a new supervisory training position at Big Rock Point. This individual is responsible, among other things, for providing additional detailed training in radiological 801, c o 0/79 y

Mr Dennis M Crutchfieldo Chier 2

Big Rock Point Plant November 14, 1980 evaluation, particulary for offsite dose consequences under abnormal conditions,

to the existing shift complement. By letter dated September 2h, 1980, Region III accepted this additional training position as a satisfactory solution to providing adequate radiation protection off-shift.

COFSIENT C Corrected in Site Emergency Plan Revision 60.

CObNENT D No action required at this time.

C0!CtENT E Corrected in Site Emergency Plan Revision 60.

COMMENT F A dedicated line has been installed fror Big Rock Point Plant to the State On-scene Emergency Operating Center at the Michigan State Police Post in Petoskey.

This is in addition to direct police radio communications.

CObSIENT G Public Information Program and News Media information vill be incorporated in Site Emergency Plan Revision 60.

COM5fENT H (b4f" No action required at this time.

C05BIENT I No action required at this time.

C05DfENT J Plant Implementation Procedure hR assigns a security officer to the beach to evacuate any fishermen or other persons and su= mons the US Coast Guard.

C05BIENT L No action required.

C05 STENT M Our present recovery plan is found in Appendix D No 22, " General Office Nuclear Emergency Implementation Procedure".

These procedures will be submitted at a later date,as required by NRC schedule.

C05BfENT N Exercise and drill information vill be included in Site Emergency Plan Revision 60.

Mr Dennis M Crutchfield, Chief 3

Big Rock Point Plant 11, 1980 November 4

COMMErrr o Training program information vill be included in Site E:nergency Plan Revision 60.

C0fetErlT P No action required.

David P Hoffman (Signed)

David P Hoffman Nuclear Licensing Administrator CC Director, Region III, USNRC NRC Resident Inspector - Big Rock Point i

4 r

1

- - -,