ML19351D627

From kanterella
Jump to navigation Jump to search
Forwards Comments Re TMI Action Plan Requirements Preliminary Clarification Per Addendum to NRC & 800926 Meeting.Substantial Change to Requirement Criteria Would Affect Current Implementation Schedules.W/O Encl
ML19351D627
Person / Time
Site: Farley  
Issue date: 10/06/1980
From: Clayton F
ALABAMA POWER CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8010140305
Download: ML19351D627 (1)


Text

.

Alabam; Power Comp:;ny 600 Norin 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Te!echone 205 250-1000 m

F. L CLAYTON, JR.

sen,o, vice ere.ioent Alabama Power l

October 6, 1980 tm sournen sa::rc sniem l

Docket No. 50-348 50-364 l

Mr. Darrell G. Eisenhut, Director l

Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Co= mission Washington, D.C.

20555 Re: Alabama Power Company Comments on Preliminary Clarification on TMI Action Plant Requirements t

Dear Mr. Eisenhut:

Af ter review of your letter dated September 5,1980, the addendum to this letter, and as a result of the meeting conducted by your staff on this subject on September 26, 1980 in Atlanta, Georgia, Alabama Power Company submits the comments contained in Enclosure 1 on clarification of TMI l

requirements. One significant observation not generally addressed in

!. is that Alabama Power Company has previously made commitments for all January 1,1981 action requirements. These commitments and plans are to satisfy criteria previously issued by the NRC.

To substantially change the criteria for these requirements could affect current implementation schedules, in addition to, resulting in over-budgeted cost for the hardware items.

Please contact me if you need further clarification on Alabama Power Company's comments.

Yours truly,

,n.

. L <.

F. L. Clapton, Jr.

FLCJr/0DK:aw cc:

Mr. R. A. Thomas O '/

Mr. G. F. Trowbridge Mr. L. L. Kintner 5

Mr. E. A. Reeves Mr. W. H. Bradford g) 882 014o sos

_ ------------