ML19351D268

From kanterella
Jump to navigation Jump to search
Requests Extension Until 801024 for Util Response to NRC Re Control & Handling of Heavy Loads Due to Extensive in-house Reviews
ML19351D268
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/30/1980
From: Hukill H
METROPOLITAN EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
TLL-491, NUDOCS 8010090391
Download: ML19351D268 (1)


Text

'

p O

Metropolitan Edison Company Post Office Box 480 g

Midolatown, Pennsylvania 17057 717 9444041 Writer's Direct oial Number September 30, 1980 TLL 491 Office of Nuclear.aictor Regulation Attn:

D. G. Eiser at.c, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Control of Heavy Loads We have prepared a draft response to your letter of June 26, 1980 concerning the control a..i handling of heavy loads. However, due to the extensive in-house reviews required for a letter of this nature, we are requesting an extension until October 24, 1980 for final submittal.

Sincerely, t

. D. H kill Director, TMI-l HDH:DGM: hah cc:

J. T. Collins B. J. Snyder B. H. Grier D. Dilanni R. W. Reid H. Silver l

o s le l

\\

i l

l

" 'etrecoi tan Ec: son Company s a '/emcer cf :*e Genera: Pube La t es Systern S 010090 3q g