ML19351D188
| ML19351D188 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 09/22/1980 |
| From: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 9591, IEB-80-20, NUDOCS 8010090175 | |
| Download: ML19351D188 (1) | |
Text
,
7Tc M.
CODSumBIS Power C0mpBuy u n ~s
. = - ~ 2u, c.n.,.i ces.c ; 194s w e.,n.ii no.a. a.ca.on, u cn.9.n 49201 + t517s 788 0640 September 22, 1980 J G Keppler, Regional Director Office of Inspect. ion and Enforcement US Nuclear Regulatory Conraission Region 3 799 Roosevelt Rd Glen Ellyn, IL 60137 MIDLAND PROJECT IE BULLETIN 80-20 FILE: 0505.12 UFI:
99*02*05*10 SERIAL: 9591 A review was conducted as requested by IE Bulletin 80-20, and the determina-tion was made that Westinghouse Type W-2 control switches with spring return to neutral position have not been used nor will they be used in safety-related applications currently designed.
Approximately 12 man-hours were expended to perform the actions requested by this Bulletin.
a). M JVC/JNL/pg CC DHood DBMiller HDThornburg oc0980-0023a100 8 o lo o 9o/75 SEP 2 51980 Q