Tz e ILLUMINATING BLDG. e PUBUC SOUARE a CLEVELAND. oHlo 44101 a TELEPHONE (216) 6231350 e Mall ADDRESS: P. O. BOX 5000 7,
D:lwyn R. Davidson v>CE PHE S10ENT Sv$7E M (NGINE E RING AND CONSTHUCTION September 4, 1980 Mr. James C. Keppler Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Glen Ellyn, IL 60137 Re:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Construction Permit Nos.
CPPR-148; CPPR-149 IE Bulletin No. 80-20 Dear Mr. Keppler-In accordance with your request, the following information is provided in response to It Bulletin No. 80-20.
Westinghouse type W-2 spring return to neutral control switches are not used in the safety related circuit design at Perry. An estimated fifteen hours were expended in review and response to this bulletin.
If additional information is need, please let me know.
Ve,ry truly yours,
/g ph n dah n}
^
Dalwy R. Davidson ViceYresident System Engineering & Construction DRD:kas cc:
U.S. Nuclear Regulatory Commission Gffice of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C.
20555 U.S. Nuclear Regulatory Commission c/o Doct1 ment Management Branch Washington, D.C.
20555 SEP 1719801 8e1009oll5