ML19351D149
| ML19351D149 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 09/08/1980 |
| From: | Renberger D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| GO1-80-251, IEB-80-20, NUDOCS 8010090083 | |
| Download: ML19351D149 (1) | |
Text
_
TIG
- NUI"IF h/'
N 9
y; Washington Public Power Supply System hgg,34'
@?A A JOINT OPERATING AGENCY a
o.no,...
3ooo c.o. w.......
w.,
n.c u..w......
..ssa ooo September 8,1980 G01-80-251 Docket Nos.
50-460 50-513 f tr. R. H. Engelken, Director U. S. f uclear Regulatory Commission Region V i
1990 N. California Boulevard Suite 202 Walnut Creek Plaza Walnut Creek, California 94596
Dear !!r. Engelken:
Subject:
WPPSS NUCLEAR PROJECT f!0S. 1 AND 4 RESPONSE TO IE BULLETIN 80-20 In response to the subject IE Bulletin, please be advised that our liuclear Project Numbers 1 and 4 do not use Westinghouse Type W-2 control switches with spring return to neutral position in safety-related applications.
Approximately one man-day vas expended in performing the actions re-quired by IEB 80-20 Very truly yours,
% 0c.bctgM D. L. Renberger Assistant Director, Technology bk Office of I&E, Division of RCI--Washington, D.C.
cc:
W. Woods, fiUS N. S.-Reynolds, D&L SEE 010 0 9 0 OB3 8
pd-54