LIC-89-1145, Forwards Monthly Operating Rept for Nov 1989 for Fort Calhoun Station & Revised Operations Summary for Rept.Listed Supplemental Sections Deleted from Rept
| ML19351A659 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 12/15/1989 |
| From: | Morris K OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19351A660 | List: |
| References | |
| LIC-89-1145, NUDOCS 8912200288 | |
| Download: ML19351A659 (2) | |
Text
_ _ _
M.. e W
.~ ~ -
,a
.y
.3 t
Omaht 3ublic Power District 1623 Harney Omaha, Nebraska 68102 2247 402/536 4000 i
December 15, 1989 LIC-89-1145 U? S. Nuclear Regulatory Commission
- Attn:-Document Control Desk Mail Station ~PI-137 Washington, DC 20555
Reference:
Docket No. 50-285 Gentlemen:
SUBJECT:
?
November Monthly Operating Report and-Report Revisions Pursuant to iechnical Specification Section 5.9.1 and 10CFR Part 50.4(b)(1),
please find enclosed one copy of the November 1989 Monthly Operating Report
,(MOR) for the Fort Calhoun Station (FCS) Unit No.1.
Also, please note that
.the content of the Operations Summary of the MOR has been revised to better
. meet reporting requirements.
LAccording to Technical Specification Section 5.9.1(c), the MCR should include i
. operating' statistics, shutdown experience, and challenges or failures to the pressurizer Power 0)erated Relief Valves (PORVs) or safety valves during the subject month. Omala Public Power District's (OPPD's)' previous MOR contained substantially irore data than required by OPPD's Technical Specifications and Regulatory Guide 1.16.
Upon completion 1of a records search by 0 PPD Nuclear Licensing personnel, no basis for OPPD's inclesion of the additional-data in the Operations Summary coulf be found. Therefore, the following supplemental sections have been Ldeleted from OPPD's_MOR:
o' A.
Performance Characteristics
.B.
Changes.6 Operating Methods f
L C.
-Results of Surveillance Tests and Inspections
[
F.
Changes in Plant Operating Staff G.
Training 8912200?s8 891215 PDR
- N ADOCK 05000285 PDC
/ LI \\
=
q f)3 4y Employment w h E al Opportunity 4.$ $124 i
o.
$l 8;
r
.* 1.
'N
. i a.'.
m L
U. S. Nuc ear Regulatory Commission i
l t-LIC-89-Il45' l
Page 2 L
(-
If,vou should have any questions, please contact me.
i Sincerely,
/hIfhh54/$db#
K
. Morris Division Manager Nuclear Operations KJM/pje Enclosures c: _ R. D. Martin, NRC Regional Administrator P. H. Harrell, NRC Senior Resident Inspector R. M. Caruso -~ Combustion Engineering R..J; Simon - Westinghouse Office ~ of Management & Program Analysis (2)
Nuclear Safety Analysis Center INP0 Records Center
.American Nuclear Insurers s
t i
- - - -