ML19351A659

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Nov 1989 for Fort Calhoun Station & Revised Operations Summary for Rept.Listed Supplemental Sections Deleted from Rept
ML19351A659
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/15/1989
From: Morris K
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19351A660 List:
References
LIC-89-1145, NUDOCS 8912200288
Download: ML19351A659 (2)


Text

_ _ _ __ __ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ ,

M. . e W  !

.~ ~ - ,a

" .y

.3 t Omaht 3ublic Power District 1623 Harney Omaha, Nebraska 68102 2247 l 402/536 4000 i

December 15, 1989  ;

LIC-89-1145 U? S. Nuclear Regulatory Commission

- Attn:-Document Control Desk Mail Station ~PI-137 Washington, DC 20555

Reference:

Docket No. 50-285 .

Gentlemen:

SUBJECT:

? November Monthly Operating Report and-Report Revisions ,

Pursuant to iechnical Specification Section 5.9.1 and 10CFR Part 50.4(b)(1),

please find enclosed one copy of the November 1989 Monthly Operating Report

,(MOR) for the Fort Calhoun Station (FCS) Unit No.1. Also, please note that

.the content of the Operations Summary of the MOR has been revised to better

. meet reporting requirements.

LAccording to Technical Specification Section 5.9.1(c), the MCR should include

. operating' statistics, shutdown experience, and challenges or failures to the i

pressurizer Power 0)erated Relief Valves (PORVs) or safety valves during the subject month. Omala Public Power District's (OPPD's)' previous MOR contained substantially irore data than required by OPPD's Technical Specifications and Regulatory Guide 1.16. ,

Upon completion 1of a records search by 0 PPD Nuclear Licensing personnel, no basis for OPPD's inclesion of the additional- data in the Operations Summary coulf be found. Therefore, the following supplemental sections have been Ldeleted from OPPD's_MOR:

o' A. Performance Characteristics '

.B. Changes .6 Operating Methods f L C. -Results of Surveillance Tests and Inspections

[ F. Changes in Plant Operating Staff G. Training 8912200?s8 PDR 891215

N ADOCK 05000285

=

PDC / LI \

q  ;

f)3 4y , _;

i 4.$ $124 Employment w h E al Opportunity

o.

$l 8; r

.* 1.

'N

a.'.

. i m ,

L U. S. Nuc lear Regulatory Commission i t- LIC-89-Il45' ,

l Page 2 L

l

(-

If ,vou should have any questions, please contact me.

i Sincerely,

/hIfhh54/$db#

K . Morris Division Manager Nuclear Operations KJM/pje .

Enclosures c: _ R. D. Martin, NRC Regional Administrator ,

P. H. Harrell, NRC Senior Resident Inspector ,

R. M. Caruso -~ Combustion Engineering R..J; Simon - Westinghouse Office ~ of Management & Program Analysis (2)

Nuclear Safety Analysis Center  ;

INP0 Records Center

.American Nuclear Insurers s

t i