Forwards Revised Response to SER Open Item 4 Re safety- Related Snubbers.Response Revised to Resolve NRC Concerns Raised During 810611 & 16 Meeting W/Applicant
ML19351A082
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 06/23/1981
From: Novarro J
LONG ISLAND LIGHTING CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
SNRC-587, NUDOCS 8106250216
Download: ML19351A082 (2)


Text

B

~

y.A f

LONG ISLAND LIGHTING COMPANY SHOREHAM NUCLEAR POWER STATION

.m__--

P.O. BOX 618. NORTH COUNTRY ROAD e WADING RIVER. N.Y.11792 June 23, 1981 SNRC-587 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 SHOREHAM NUCLEAR POWER STATION - UNIT 1 Docket No. 50-322

Dear Mr. Denton:

Enclosed herewith are sixty (60) copies of LILCO's revised response to Safety Evaluation Report (SER) Open Item #4 regarding safety related snubbers.

This response has been revised to resolve NRC Staff reviewer concerns raised during meetings with the Applicant on June 11 and 16, 1981.

If you require additional information or clarification, please contact this office.

Very truly yours,

[ S.

OVhIC(WJ 4

l J.

P. Novarro Project Manager Shoreham Nuclear Power Station CC/pd Enclosures cc:

J.

Higgins h00l s

iI e7 e

+

r 4

\\

5. JUN 2 41SS)> L 810 6 25 0 AUo s

e g

~

FC 4935

d SNPS Item #4 - Safety Related Snubbers which will be listed in the Tables of.STS 3/4.7.9.

Prior to installation, all safety related snubbers are opera'-

tionally stroked to determine that they-are not frozen, seized 4

or jammed.

After installation and no more than 6 months prior l

to system pre-operational testing, snubbers are visually in-spected for signs of damage or impaired operability as well as for adequate swing clearances in accordance with a LILCO Startup l

organization test procedure.

In addition, their location, orientation, position setting and configuration are verified to be in accordance with approved design drawings.

Fluid level and_ leakage are not applicable to Shoreham as hydraulic snubbers are not employed in any =afety related systems.

The snubber thermal movements for those systems that have oper-ating temperatures in excess of 2500F will be verified during the Startup Test phase under STP-811

" System Thermal-Expansion Test Procedure".

This includes verification of the expected snubber thermal movements and swing clearances.

Discrepancies or-inconsistencies will be dispositioned prior to proceeding to the next test plateau.

A preliminary list'of the snubbers is

. attached.

The final list will be included'in the station tech-nical specifications.