ML19351A039

From kanterella
Jump to navigation Jump to search
Advises That IE Circular 81-05, Self-Aligning Rod End Bushings for Pipe Supports, Was Sent to Listed Licensees on 810331
ML19351A039
Person / Time
Site: Palo Verde, Columbia, Diablo Canyon, San Onofre, Humboldt Bay, Rancho Seco, Washington Public Power Supply System, Satsop, Trojan
Issue date: 03/31/1981
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19351A040 List:
References
NUDOCS 8106250085
Download: ML19351A039 (1)


Text

?

~.\\. *.

s wu 8

o UNITED STATES 8i

~,%

NUCLEAR REGULATORY COMMISSION s

Oe E

REGION V

' E

  • '? t) ~

8

[

o-1990 N. CALIFORNIA BOULEVARD

  • 4,,, + *o 8h

(

SUITE 202, WALNUT CREEK PLAZA F 4 g

WALNUT CREEK, CALIFORNIA 94596 g}

,h

\\

g'flj.W lJ March 31, 1981 g} APR 2 819815 2 mmk NOTE TO: ALL THOSE ON IE CIRCULAR DISTRIBUTION LIST k

J FROM:

IE, REGION V P

SUBJECT:

IE CIRCULAR N0. 81-05:

SELF-ALIGNING R0D END BUSHINGS FOR PIPE SUPPORTS The attached IE Circular No. 81-05 was issued this date to the following licensees:

1.

Arizona Public Service Company (Palo Verde 1, 2 & 3, Docket Nos. 50-528, 50-529, & 50-530).

2.

Pacific Gas & Electric Company (Humboldt Bay Unit 3, Diablo Canyon Units 1 & 2, Docket Nos. 50-133, 50-275 & 50-323).

3.

Portland General Electric Company (Trojan, Docket No. 50-344).

4.

Sacramento Municipal Utility District (Rancho Seco, Docket No. 50-312).

5.

Southern California Edison Company (San Onofre Units 1, 2 & 3, Docket Nos. 50-206, 50-361 & 50-362).

6.

Washington Public Power Supply System (WNP-1, WNP-2, WNP-3, WNP-4

& WNP-5, Docket Nos. 50-460, 50-397, 50-508, 50-509 & 50-513).

Region V has made distribution to the Accessions Unit for the PDR, LPDR, NSIC, TIC and Central Files.

i

Enclosure:

IE Circular No. 81-05 l

l l

Q 8106250

{

-