ML19350F098

From kanterella
Jump to navigation Jump to search
Advises That Tech Specs Table 3.3.1-2, Reactor Protection Sys Response Times, Will Include Entry for Thermal Power Monitor Time Constant.Surveillance for Response Time Parameter Required Every 18 Months
ML19350F098
Person / Time
Site: Fermi 
Issue date: 06/23/1981
From: Colbert W
DETROIT EDISON CO.
To: Kintner L
Office of Nuclear Reactor Regulation
References
EF2-53861, NUDOCS 8106240210
Download: ML19350F098 (1)


Text

X? y::.4

!6 g!

mt

? qw,n i 2

= ~ e m :;r::,

,f

.w. s~

. nin m.ww D h i; ls 1-y,,

'2 June 23, 1981 EF2 - 53861 Mr. L. L. Kintner Division of Project Management Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Kintner:

Reference:

Enrico Fermi Atcmic Power Plant, Unit 2 NRC Docket No. 50-341

Subject:

Thermal Power obnitor Table 3.3.1-2 of the Fermi 2 Technical Spec;i.fication entitled,

" Reactor Protection System Response Times," will include an entry for the Thermal Power Fbnitor Time constant. Surveillance require-ments for RPS response time parameter are specified in Item 4.3.1.3 as required once each 18 months.

Sincerely, Yfhbt W. F. Colbert Technical Direc'wr Enrico Fermi 2 hTC/LEW/dk i

ec:

B. Little kODI s

l

/

O

~ ~~ goo