Monthly Operating Rept for May 1981
ML19350E797
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/10/1981
From: Howlett G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML19350E788 List:
References
NUDOCS 8106230530
Download: ML19350E797 (5)


Text

, _

t  ;

.__.l OPERATING DATA HEl ORT DOCKET NO. 50-336 DATE D6-10-8I S. H. Howlett COstPLETED 1ELErilONE . 11Y _12.03Bf/-17 X-364 OPERATING STATUS Millstone 2 Notes

  • Items 21 & 22
1. Unit Name: Cumulative, are computed
2. Reporting Period: M_3Y_1981 -

using a weighted average.

3. Licensed Thermal Power (Niht):

2700

4. Nameplate Rating (Gross SIWey 90.9
5. Design Electrical Ratin;r (Net SIWE): 870
6. Stasimum Dependable Capacity (Gross SIWE): 895
7. 51asimum Dependable Capacity (Net 51Wel: 864
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:

None

9. Power Lesel To Which Restricted,If Anv(Net Slwe): None '
10. Reasons For Restrictions.If Any: None This 5!onth Yr.-to Date Cumulatis e' 4

II. !!ours In Reporting Period 744 3,623 47.615

12. Number Of flours Reactor Was Critical 427.7 2,887.2 34,136.5
13. Reactor Resene Shutdrawn llours 0 0 -

2,076.9

14. Ilours Generator On Line 407 2,832.2 32,601.2
15. Unit Reserve Shutdown flours 0 0 408.2
16. Cross Thermal Energy Generated (SIWil) 987,167 _7g456,594 80,691,915 .
17. Gross Electrical Energy Generated t.\lWil) 344,630_ , , ,

2,482,690 _26,155,607

18. Net Electrical Energy Generated (SIWil) 328,013 2,387,456 25,049,502
19. Unit Senice Factor 64.7 78.2 68.5
20. Unit Asailability Factor 54.7 78.2 69T
21. Unit Capacity Factor (Using SIDC Net) 51.0 76.3 *63.5
22. Unit Capacity Factor (Using DER Net) 50.7 75.7 *62.3
23. Unit Forced Ontage Rate 45.3 21.8 22.6
24. Shutdowns Scheduled Oser Nest 6 Slonths (T)pe. Date.and Duration of Each): , , .

None -

25. If Shut.Down At End Of Report Period. Estimated Date of Startup: '
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRi flCALITY N/A N/A INITIA L Ell CIRICITY ___11/1 2N/L l CO%1%1ERCIAL OPER AIlON N/A N/A el171 S 106 230$30

DOCKET NO.

50-336 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Mi' Istone 2 .

DATE 6-:.0-81 COMPLETED 3Y G H. Howlett REPORT MONTH May 1981

- TELEPHONE (203) 447-1791

, .5 ? h .E Licensee ,E-r, 'b.

c Cause & Corrective N,o. Date g 3g sj jg5 Event =? S.3 Action to

$5 $ j di j Report a N0

[U Prevent Recurrence b

3 810505 F 332.8 A 1 81-018 HH INSTRU Upon the loss of the two operating CB SUP0RT feed pumps on low suction pressure, CC SUPORT the unit was manually tripped. The CH SUPORT loss of pump sucticn pressure was CF SUP0RT apparently caused by a perturbation in the feed system, which was brought about by the failure of a computation module, located in the steam generator level control system. The unit was placed in cold shutdown for a 14 day mechanical snubber outage and subse-quently returned to nonval full power operations.

T 810518 4.2 g 4 f G 3 N/A N/A N/A Rx trip from 15% power during plant start up on low steam generator level, W

Sumary: The unit operated at or near 100% of rated thermal power throughout the report period except for the g outages of the 5th and 16th.

Z 3:=

r-(9/77)

AVI R 4GE D ULY L*Nt11 owER ttyrt l"

' DOCKET NO. 50-336

. UNIT _ Millstone 2 __

DATE 06S0-81 CON!PL2(ED BY & Howlett 1ELEPilONE (203) 447-1791 -

X-364 s!ON111 May 1981 DAY AVER ACE DAILY l'OWER LEVEL DAY AVERAGE DAILY POWER LEVEL

(%!We Net) ggy,,3,,3 1

852 0 (-16) g7 853 2

is 0 (-28) 3 854 381 39 4 853 699 2a 5

- 79 746 21 6 0 (-27) 22 777 7 0 (-24) 23 822 s 0 (-7) 24 859 9 0 (-6) 25 862 10, 0 (-5) 26 863 11 0 (-5) _

27 864 12 0(-5) 2g 864 13 0(-5) 2, 864 14 0 (-5) 30 863 15 0 (-5) 33 863 16 0 (-5)

INSTRUCTIONS On this format.!!st the userage daily tr.it power inelin .'. We Net for each day in the apuriin;;n.mth.Com, use to - -

the r.calest whole :wpwatt. l 1

i (9/17 %

9

Docket No. 50-336 Date: 6/11/81 Completed By: G.H. Howlett III_ .

Telephone: 203/447-1971 X364 REFUELING INFORMATION REQUEST

1. Name of facility: Millstone 2
2. Scheduled date for next refueling shutdown:

Commenced refuel outage November 28, 1981.

3. Schedule date for restart following refueling: January 16, 1982
4. Will refueling or resumption of operatior thereafter require a technical l specification change or other license amendment?

l It is not anticipated that Cycle 5 sperations will require Technical Specification changes or other License amendments.

5. Scheduled date(s) for submitting licensing action and supporting information:

l Licensing documentation will be provided a minimum of 90 days i prior to start-up of Cycle 5 or as documented in the R.A. Clark letter to W.G. Counsil, dated 10/6/80, authorizing Cycle 4 i

operation.

l 6. Important licenring considerations associated with refueling, e.g., new or l different fuel design or supplier, unreviewed design or performance analysis

methods, significant changes in fuel design, new operating procedures

i N/A 1

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel
storage pool:

(a) In Core: 217 (b) 216

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

667

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1985, Spent Fuel Pool, full core off load capability is reached.

1987, Core Full, Spent Fuel Pool contains 648 bundles.

r-i T ckLt !!9 50-J36 Page 1 of 1 . Date b/II/81 Unit Name- Millst:;ne 2

< Completed 3y li H Howlttt Tely, hone (203)447-1791 X364 CORRECTIVE MAINTENANCE

SUMMARY

F0'l SAFETY RELATED EQUIPMENT Report Month April 1981 DATE SYSTEM COMPONENT MAINTENANCE ACTION 4/2/81 Auxiliary Feedwater Steam driven Aux Feed Pump P-4 Replaced pump packing. See LER 81-014

~

k I

e

~ ' ' '

_ _1*"_~~* _

'*""*C'- - - - - -

~

-'**-wr-- -e-gr -e a N .ii-