ML19350E576
| ML19350E576 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 06/18/1981 |
| From: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| IEB-80-11, NUDOCS 8106230297 | |
| Download: ML19350E576 (1) | |
Text
__--_
THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P o box 5000 e CLEVELAND. OHIO 44101 o TELEPHONE #216) 622 9800 m ILLUMINATING BLOG.
e 55 PUBLIC SoVARE Serving The Best,0 cation in the Nction 1
Dalwyn R. Davidson y'\\
lb v.CE PRES OENT Qk svsrtu ENoiNecaro aNo con 31RUCTloN TIf
\\-
l>Ufj7 June 18, 1981
'gy y
JUll 2 21981 w U j{. "*Q"" p _N-Mr. Darrell G. Eisenhut, Director
' g4' Division of Licensing N
U.S. Nuclear Regulatory Comission Washington, D.C.
20555
\\.b :
\\P
'Y Perry Nuclear Power Plant Docket Nos. 50-40; 50-41 Masonry Wall Design
Dear Mr. Eisenhut:
This letter is in response to the requests for infcrmation in the April 21, 1980 generic letter from S. Varga and May 8,1980 IE Bulletin No. 80-11 on the use of Category I masonry walls.
For Perry, Units 1 and 2, there are m =asonry walls constructed, designed, or planned within the buildings of the Nuclear Is]And (Control Complex, Diesel Generator Bnildi'ng, intemediate Enild'ng, Auxiliary Buildings Units #1 and #2, Fuel Handling Builaing, Reactor Buildings Units #1 and #2, and Radwa'ste En41 ding) or Turbine Areas (Service Building, Turbine Enildings Units #1 and #2, Heater Bay Units #1 and #2, Off-Gas Units #1 and #2, Turbine Power Complex Units #1 and #2, Water Treatment Building, and Auxiliary BoiJer Building) or the major pumphouses (Emergency Service Water Pumphouse, Circulating Water Pun:phouse Units #1 and #2).
The above mentioned 1980 requests for infor=ation were not applicable since Perry was not undergoing active operating license review.
Very truly yours, i '
04 l
Dal R. Davidson Vice President System Engineering and Construction DRD: dip i