ML19350E267
| ML19350E267 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 06/09/1981 |
| From: | Ballentine J TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19350E268 | List: |
| References | |
| NUDOCS 8106170221 | |
| Download: ML19350E267 (1) | |
Text
-~
TENNESg@yMM7aMJJfORITY P. O. Box 2000 Daisy, Tennessee 37319 JUN 091981 Nuclear Regulatory Commission Office of Management Information and Program Control Washington, DC 20555 Gentlemen:
Enclosed is the May, 1981 Monthly Operating Report for Sequoyah Nuclear Plant Unit 1.
Very truly yours, TENNESSEE LEY AUTHORITY g
J. M. Ball ntine P1 at Superintendent Enclosure cc (Enclosure):
Lirector, Region II Director, Office of Management Nuclear Regulatory Commission
,Information and Program Control Office of Inspection and Enforcement Nuclear Regulatory Commission 101 Marietta S.;eet Washington, DC 20555 (2 copies)
Suite 3100 Atlanta, GA 30303 (1 cop )
i l
Director, Office of Inspec 'on and Enforcement Nuclear Regulatory Commission i
Washington, DC 20555 (10 copies)
Mr. A. Rubio, Director Mr. Bill Lavallee, NSAC Electric Power Research Institute ygb; ' i I,c0~ ' /,
P. O. Box 10412 Palo Alto, CA 94304 (1 copy)
C h1 J
bg\\
I d.
Westinghouse Electric Corporation T
16 jb P. O. Box 355 C'.-
M M
3
/ [
Pittsburgh, PA 15230 (1 copy)
Q p * [ '* # b, e-/
'O/
/2/
N 81061 7 0W EL An Equal Opportunity Employer
..-