Text
50-2y
\\.
public service company os c:Mracce 12015 East 46th Avenue, Suite 440; Denver, CO 80239 l
kg/
May 18, 1981 Fort St. Vrain
/ C\\ h[.),+
Unit No.1 P-81147 d
1 lA M 2 6
- ' N"w#
,J e
fir. Darrel Eisenhut, Director
//
Division of Reactor Licensing 4, k_.
s Office of fluclear Reactor Regulation U.S. fluclear Regulatory Commission D
Washington, DC 20555
Subject:
ileteorological Upgrades flVREG-0737
Reference:
P-81127
Dear Mr. Eisenhut:
In the above referenced letter, we committed to a phased im-plementation schedule of meteorological equipment that would meet the requirements of flUREG-0554.
At that time, we stated that we had experienced equipment delivery problems and that our schedule was based on " newly established" delivery dates.
Since that time, some of our suppliers have continually delayed their shipping schedule to us by two week intervals, Please see Attachment A for a resume of our equip.nent deliv-ery problems, and Attachment B for a resuae of installation status.
Given the equipment delays that we have experienced and the fact that the ten (10) meter tower is operational and providing data to the flational '4eather Service, we would in-tend to operate as follows:
1.
Continue utilizing the existing weather instrumen-tation mounted on the reactor building as our pri-mary source of neterological information.
k
%19527018 9
.n,
P-31147
+
Page 2 May 13, 1981 2.
We presently have an agreement with the National Weather Service (NWS) to obtain meteorological data on an as need basis.
We will utilize the NUS in-femation from the ten (10) meter tower as our back up source.
To ensure the availability of this in-formation monthly checks will be made with the NWS for the ten (10) meter tower information.
3.
As soon as practicable after the completion of the ten (10) meter tower data systems and replacement of the existing instrumentation on the reactor bu-ilding, we will establMh the program as outlined in P-81070, Attachment I, Items 8a, 8b, and 8c.
4.
The DCM as forwarded with P-81070 is presently :n effect as a part of our emergency procedures.
At this point, we feel that the only schedule that we can commit to and place credibility in, is one that does not rely on equipment shipping schedules.
We can and will com-mit to installing our meteorological equipment within 30 days of its receipt.
We hope that you recognize these delays are beyond our con-trol and that we are continuing in our efforts to expedite deliveries and install equipment.
Very truly yours,
,a,.
/
Frederic E. Suart Nuclear Project Manager FES/f1EN: pa l
Attachments
P-81147 ATTACHMENT A Page 1 of 1 EQUl? MENT DELIVERY STATUS Wind Speed and Direction - Original Shipping Date March 18, 1981 Teledyne Geotech - Vendor Follow Up Phone Calls First 04/01/81 Revised Shipping Date 04/24/81 Second 04/08/81 Revised Shipping Date 04/24/81 Third 04/15/81 Revised Shipping Date 05/01/81 - 05/08/81 Fourth 04/22/81 Revised Shipping Date 05/08/81 - 05/15/81 Fifth 04/28/81 Revised Shipping Date 05/15/81 - 05/22/81 Sixth 05/04/81 Revised Shipping Date 05/22/31 - 05/29/81 Sevent:1 05/11/81 Revised Shipping Date 05/29/81 - 06/05/81 Precipitation Equipment - Original Shipping Date 3/18/81 Science Associates - Vendor Follow Up Phone Calls Firs t 04/27/81 Revised Shipping Date 05/24/81 Second 05/11/01 Revised Shipping Date 06/01/81 Chart Recorders - Original Shipping Date 04/20/81 l
l Esterline Angus - Vendor I
Follow Up Phone Calls l
l First 04/20/81 Revised Shipping Date 05/01/81 l
Second 05/04/81 Shipped 05/01/81 l
i
P-31147 ATTACHT1ENT B Page 1 of 1 EQUIPf1ENT INSTALLATI0fl STATUS 4
ITEM IllSTALLATION STATUS NOAA NWS 10 Meter Interface Instrumented Complete Tower PSC Interface in Progress Data Transmission Installed Cable Multiplexing Installation Equipment
'in Progress Wind Speed &
Not Received Direction Equipment to Meet Regulatory Guide 1.23 Accuracy Requirements i
Precipitation Not Received Equipment Chart Recorders Shipped 05/01/81 Received 05/18/81 i
I l
[
_.