p'M!v p,
UNITED STATES y ) ) s-q ' gg NUCLEAR REGULATORY COMMISSION WASHIN TON, D. C. 20555 8
MAY 131981
\\ '.v j
Docket Nos.: STN 50-546/547 MEMORANDUM FOR:
B. J. Youngblood, Chief, Licensing Branch No. 1, DL FROM:
K. L. Kiper, Project Manager, Licensing Branch No.1, DL
SUBJECT:
SUMMARY
OF MAY 11, 1981 MEETING WITH PUBLIC SERVICE COMPANY OF INDIANA, INC.
A meeting was held on May 11, 1981 in Bethesda, Maryland with Public Service of Indiana, Inc. (PSI) to discuss the schedule for the operating license review of the Marble Hill application and to discuss replication by Marble Hill of the Byron design. A list of attendees is given in Enclosure 1.
Based on its present schedule, PSI plans to file a complete update to the Marble Hill FSAR inDecember 1982 to support a fuel load date for Unit 1 of June 1986. A proposed schedule for the OL review was presented by PSI.
(See ). Also, the applicant presented its general approach to replication, based on a letter of November 3,1975, from NRC to PSI.
(See Enclosure 3). The Marble Hill design is a replicate of the Byron cesign with changes only for site specific requirements and for items such as the physical security program. The applicant presented its concern that the staff make optimum use of the replicate design in its review of Marble Hill.
~,..
.L &W {-f'l %
Kenneth Kiper, Pro 3ect Manager Licensing Branch No.1 Division of Licensing
Enclosure:
As stated cc: See next page 81051806%
9
Mr. S. W. Shields Senior.Vice President Nuclear Division P. O. Box 190 New Washington, Indiana 47162 ces:
Michael J. Walro, Esq.
Charles W. Campbell, Esq.
Vice President and General Counsel Attorney for the Planning Board and the Board of Zoning Appeals of Public Service of Indiana Jefferson County 1000 E. Main Street Plainfield, Indiana 46168 427 East Main Street Madison, Indiana 47250 Mr. William Kortier Mr. Robert C. Slover Atomic Power Distribution Westinghouse Electric Corporation Save the Valley, Inc.
P. O. Box 813 P. O. Box 355 Pittsburgh, Pennsylvania 15230 Madison, Indiana 47250 Walker C. Cunningham, Jr., Esq.
Mr. P. L. Wattelet 1129 Kentucky Home Life Building Sargent & Lundy Engineers Office of the Jefferson County Attorney 55 East Monroe Street Chicago, Illinois 60603 Louisville, Kentucky 40202 David K. Martin, Esq.
Harry H. Voigt, Esq.
Assistant Attorney Generals LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N. W.
Room 34, State Capitol Washington, D. C.
20036 Frankfort, Kentucky 40601 George A. Leininger, Jr., Esq.
Donald J. Ridings, Esq.
City Attorney, City of Madison Attorney for Jefferson County 610 Old Louisville Trust Building P. O. Box 826 Madison, Indiana 47250 Louisville, Kentucky 40202 Mr. Robert Gray Bill V. Seiller, Esq.
Rural Route #1 Ewen, MacKensie and Peden Hanover, Indiana 47243 2100 Comonwealth Building Louisville, Kentucky 40202 J. Bruce Miller, Esq.
Ms. Marie Horine, President Jefferson County Attorney Save Marble Hill 1129 Kentucky Home Life Building Louisville, Kentucky 40202 Rural Route #2 Lexington, Indiana 47138 Ted R. Todd, Esq.
Attorney for the Board of Mrs. David G. Frey Comissoners of the County Solar Energy Committee, SAS 2625 S. Smith Road of Jefferson, Indiana 427 East Main Street Bloomington, Indiana 47401 Madison, Indiana 47250 Mr. Ralph C. Pickard Indiana State Board of Health Thomas M. Dattilo, Esq.
Metford & Dattilo 1330 West Michigan Street 311 East Main Street Indianapolis, Indiana 46205 Madison, Indiana 47250 Mr. Donald L. Cox Assistant Director of Law Joesph B. Helm, Esq.
Brown, Todd & Heyburn City of Louisville Sixteenth Floor 200 City hall Citizens Plaza Louisville, Kentucky 40202 Louisville, Kentucky 40202
. John A. Eyed, President Sassafras Audobon Society 10 0' Clock Ridge Road Nashville, Indiana 47488 U. S. Nuclear Regulatory Commission Resident Inspectors Office 3738 Marble Hill Road Nabb, Indiana 47147 Mr. E. P. Martin General Manager Wabash Valley Power Association P. 0. Box 24700 Indianapolis,' Indiana 46224 l
4 4
l r
6 e
,e-.
s List of Attendees NRC B. J. Youngblood K. L. Kiper PSI S. Brewer M. Evarts
n L
MARBLE HILL LICENSING SCHEDULE: OPERATING STAGE 19 81 1982 1983 1984 1985 1986 FIN AL S AFETY ANALYSIS REPORT SC::E OULE g
g g
g g
g 8
l 3
I I
I I
t/81 f2/82 4/83 2/85 5/85 1/86 G/86 O
CL G N FSAR FIL E DOCkt i SER SER ASLD OPERATING g
PhiPM ATIOid FSAR FSAit ISSUE,SUPP, DE CISION 4.j CE N SE y
3/85 6/85 12/85 S
a ACRS HE ARING tlE AHING g
REVIEW DEGINS ENDS ENVIRON ME N T A L REPOHT SCilEDULE l
1/0i 12 /8 2 4/83 1/04 6/84 1/85 4/85 6/86 bt GsN ER-OL FIL E DocktI DES FES HEARING HEARING OPER ATING PH E PAH A TION ER-OL E tt-OL ISSUED ISSUED DEGlNS [NDS LIC E N S E ISSUED o
-____--.,___,,---,,-m_
~^
~~
. ~. L,..
t,.,, ye --..,. w k.k}N&Q'%~.h ' : ?.. ,..';,
4, y.. -
I'..
1106750008 um n o s1 = =
NUCLEAR REGULATORY COMMISSION 5, j,g. g;-
W A S H I N G T O N'. D.
C.
20555 s
!!0V 0 31975 et; Docket Nos. STN 50-546 6
and SIN 50-547
- !!r e
III) h M
Dr. Ja:ses Coughlin Vice President - Nuclear g\\
-:]
Public Service Indiana 1000 E. thin Street 3
g1 Plainfield, Indiana 46168
. c..LJ
.,Y.)
Dear Dr. Coughlin:
We have completed a qualification review of Commonwealth Edison Company's Byron /Braidwood Stations for replication at the Marble Hill site as requested in your letter of November 19, 1974.
The Byron /Braidwood
?
Safety Evaluation Report was issued on April 4,1975 cnd we met with your representatives on May 20, 1975 to discuss the proposed Marble Hill Nuclear Cenerating Station, Units 1 and 2.
We find that the Byron /braidwood design is acceptable for replication at Marble Hill.
We have identified six categories of safaty issues which must be
~,1 addressed in the PSM. for the replicate plant.
Five of these categories, y-h together with the typea of items we expect you to identify and addreas,
'W are as follows:
A.
SITE RETATED MATTERS.
All safety questions related to the site or to 'the interfaces between the site and the plant must be addressed in the PSAR.
r My For example:
?*& e A full site investigation program is required includiiig
-c (1)
-==
~~O geology-seismology', foundation engineering, hydrology and meteorology matters.
(2) Revised accident analyses are required, taking into account the changes in site characteristics frem those 4
of the base plant site.
~'**
.h, b'fs1 M E@ E P T U.5fW.E" '-N m the plant on g
1 S
DUPLICATE DOCUMENT 3
.-k
'4 Entire document previously entered into system under:
%lOSluo3sy
^uo
' ~
'l b
no. or pages:
g n
c,._ _ _, w m
-