rh VERMONT YANKEE NL' CLEAR POWER STATION MONTHLY STATISTICAL REPORT 81-03 FOR THE MONTH OF MARCH, 1981 i
l i
1 810.41gg979,
OPERATING DATA REPORT DOC'GT NO. 50-271 DATE 810409 COMPLETED 3Y D.
Bernard TELEPHONE 617-872-8100 Ext. 2390 OPERATING STATUS
- 1. Uni: Name:
Ver=ont Yankee
- 2. Reporting Period: March 1981
- 3. Licensed Thermal Power (Wt):
1593
- 6. Nameplate Rating (Gross We):
540
- 5. Design Electrical Rating (Net We):514(onen) 504 (close i)
- 6. Maxi =um Dependable Capacity (Gross We):
535
- 7. Maxi =um Dependable Capacity (Net We):
504
- 3. If Changes occur in capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
- 9. Power Level to 'ihich Restricted.If Any(Net We):
- 10. Reasons For Restrictions, If Any:
This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 744.00 2,160.00
'2. Number Of Hours Reactor Was Critical
?ti.no 2.160.00 59.695.78
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.0n.
- 14. Hours Generator On-Line 744.00 2.110.60 57.712.18
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Ther=al Energy Generated (WR) 1,115.000.00 3.169.359.00 81,773,376.00 l
l
- 17. Gross Elec:rical Energy Generated (WR) 378.875.00 1.073,713.00 27,186.560.00;
- 13. Ne: Electrical Energy Generated (MTd) 1r,1_747.00 1.030.500.00 25.778.079.00 L9. Unit Service Factor 100.00 97.71 77.22.
- 20. Uni: Availability Factor 100.00 97.71 77.22
- 21. Uni: Capacity Factor (Using MDC Net) 97.01 94.66 68.43
- 22. Uni: Capacity Factor (Using DER Net) os.12 92.82 67.1C
- 23. Unic Forced Outage Rate 0.00 2.29 7.14-
- 24. Shutdowns Scheduled Over Next 6 Montus(Type, Date, and Duration of Each):
- 25. If Shu: Ocun A End Of Report Period, Estimated Date of Startup:
- 26. Uni:s In Tes: Status (Prior :o Co==ercial Operatien):
Forecast Achieved INITIAL CRI!!CALIT?
INIT!AL ELECTRICITf i
CCMMERCIAL CPERATION l
l>._
_~
e A". TQ. = 7 9 e * * */
'.M.s' *.
- 3. e'a mT.1 !.P. a'?.'
- asu.
s
.c, 3.,_. _
,.e.
.C C:.e_..
3
.. v t'
e - e = r.ree DATE 810!.09 a
-li C2.v?I,I T 3Y F.J. Surger i-i z:,?gcNE 302-257-7711 Ex:. 137 i.
v..C. :.
v..a.-..n i,
- J (F *r*.1 ?_;**T_'_
(.
9 e.' T *.7
$. C*a"71 ? ***s*T?
DAY A'e'T3 E*
Du**_*.p a
.a Da'.f A*s*73.Au_7 e
4 sa (L'e-Ne t)
(L'e 'ie:)
2,,
3<.
-..e
, 3.
3_.._
2, 3..
- s
.r 2.
s.3,
,0.
2
.e.
s c,,.
s t
32
=,
-~-
3.3s
,3.
- ,. s
.s.
.e.s,.
3, 523
..e.
l
.c..
.6.
3,,,
.0.
s..
23.
0., -
L
..7 9.
.O.
c ~
-.t.
522 i
12 so-
. A..
. 3
.... m..., C.,%.i.q.
s v'a'e-N e: f:: each day in 2: ::is f:::a, lis: :he average dr.ily uni pcver '_eva' e,g a..a..
c _.
.,.e
..e.ea.65 m...
...w._
..e
...C 4._..
7..
..y
.,, _ _ _. - _. ~.,. -... - _ _.. _. - _ _.... -..... __. _, _., _ _ _. _.., -... _ _.
- = - - -
l IltilT SilllTDOWNS AND POWER REDilCTIONS DOCKET 110 50-271 IINIT NAHK Vermont Yankee DATE 810409 REPHIrl. HONTil Ma rc h
~ ~ ~ ~ ~
COMP ED itY F.J.
Burger TEl.EPHONE 802-257-7711 Ext. 137 - ~
4 m
l ri am se a s<
u e
oa ca oao n
Cause & CurrectIve Date
'O v4 64 a
vi o I.icense go m.n lb s.
a U
- n o
'u e s o ee ae Action to e
O.
80 o e
o as as Event o.o o.o N
$b N.c (N Report #
$.0 TO U"""
"'""""C" b
O M
em m
i.
N U
o l
A.
81-06 810314 S
O B
4 N/A Rit CONROD Power reduction for control rod pattern (Power RB PllHPXX exchange and special testing, reduc-SP VESSEL.
tlon) d H10317 S
O is 4
N/A RB PuriPXX Power reduction for special testing Hi-0/
I (Power reduc-tion) l 4
81-08
- 810322 S
0 11 4
f*M Cl1 CENERA Power reduction for mafutenance of the (Power EA ZZZZZZ reactor rectre. pump MG sets. Maintenance reduc-of the of f-site higli voltage distribution tion) system was also completed.
1 l
1 2
3 4
j F: Fo ced Reason:
Method:
Exhihit G-Instructions S: Sc heilu t ed A-Equipment Failure (Explain) l-Manual for Preparation of Data j
ll-Haint enance o r Test 2-Manual Scram Entry Sheets'for I.icensee l
C-Refuellug 3-Aut omat ic Scram Event Report (I.ER) File 1
D-Regulatory Restriction 4-Other (Explain)
(NilREC 0161) l E-Operator Training & l.icense Examination 5
F-Administrative Exhibit 1 - Same Source U-Operational Error (Explain) i Il-Other (Explain) o I leDat
150CKtJ f40.
?>O-/ / I UNIT Vermont Yankee DATE 810409 CollPl.ETED BY F..I. liurger
'l El.EPIlONE 802-25/-7711 Ext. I37 SAFETY REI.ATED MAINTENANCE NATURE OF MAI. FUNCTION 1.ER OR OU'l' AGE EI!Ili PMENT MAINTENANCE NLIMi!ER CAUSE RESill.T CORRECT 1VE ACT10ll Reactor Water Cleanup Pump, Corrective N/A Normal Wear Seal f.eakage Replaced Pump P-49-IA MR 81-101 Pressure Switch PS 2-3-52h Corrective N/A Normal Wear Seat f.eakage Replaceu Valve Isolation Valve MR 81-226 RilR Valve V10-16A Corre: Live N/A Frilled Auxillary Valve Would Not Replaced cont.act, MR 01-279
- Conteset, Open ilPCI Valve V23-14 Corrective N/A Worn Packing I.eakage Adjusted Packing MR 81-282 "B"
SliGT Train Preventive N/A N/A N/A Change Charcoal In Test MR 81-286 Cell "li" SliGT Train Charcoal Corrective N/A Tests Indicitate Charcoal Contam-Replaced Charcoal Filter Filter MR 81-303 Charcoal Near End inated But Serv-Of 1.ife icable PCIS Relay 16 AK-2ti Corrective N/A Worn Parts Failed Relay Replaced Parts As MR 81-319 Necessary w
a
3 DOCKET NO.
50-271 g77 Vermont Yankee DATE C 0409 COMPLETED 3Y F.J. Burger TELEPHONE 802-257-7711 Ext. 137 REPORT MONTH March SLT ARY OF OPERATING EXPERIENCES High11thes 7erson: Yankee operated at 94.07% of rated ther=al power for the nonth.
Gross electrical generation was 378,375 MWH or94.3% of design electrical e
capact:7 Ocerating Su=mari The following is a chronological description of plant operations including other pertinent items of interest for the sonth:
3/1/81 At the beginning of the reporting period the plant was operating at 39% of rated thermal power. Turbine generator surveillance was in progress.
3/14/81 At 0015 hrs. a power reduction was initiated for stability testing, torus testing, and a control rod pattern exchange.
3/15/81 At 0700 hrs. a power ascension was started to return to full power, torus testing was still in progress.
3/17/81 At 2334 hrs, a power reduction was initiated for additional stability t e s t ing.
3/19/S1 At 0305 hrs. the testing program was completed. At 1230 hrs. a return to full power was initiated.
3/22/81 At 0645 hrs. a power reduction was initiated for maintenance on the reactor recire. pump MG sets.
Maintenance was also performed on the off-site high voltage distribution system. At 1157 hrs. a return to full power was initiated.
3/31/81 At the end of the reporting period the pInnt was operating at 99.8%