Mod 7,extending Period of Performance from 801231 to 810331 & Increasing Amount of Consideration,To Distribution Coefficients for Transuranic Elements in Aquatic Environs
ML19350C978
Person / Time
Issue date: 03/23/1981
From: Morton K, Treibel W
NRC OFFICE OF ADMINISTRATION (ADM), WASHINGTON, UNIV. OF, SEATTLE, WA
To:
Shared Package
ML19350C972 List:
References
CON-FIN-B-5749, CON-NRC-04-76-352, CON-NRC-4-76-352 NUDOCS 8104130026
Download: ML19350C978 (4)


Text

.

l'odification !;o. 7 Suppit:r..enta s nyrea.:.t ;:,

Centrac: No. NRC-04-76-352 SUPPLEMENTAL AGREEMENT BETW'EEN Uid'vERSITY OF WASHINGT0ti A'iD THE U. S. NUCLEAR REGULATORY COMMISSION THIS SUPPLEMENTAL AGREEMENT, effective the 1st day of January, 1981, by and between the UNITED STATES OF AMERICA (hereinafter referred to as the

" Government"), as represented by the UNITED STATES NUCLEAR REGULATORY COMMIS-SION (hereinafter referred to as the " Commission"), and UNIVERSITY OF WASHINGTON (hereinafter referred to as the " Contractor"),

WITNESSETil THAT:

as hereinafter WHEREAS, the parties desire to modify Contract No. NRC 04-76-352 provided, and this supplemental agreement is authorized by law, including the Energy Reorganization Act of 1974, as amended, and the Atomic Energy Act of 1954, as amended.

NOW, THEREFORE, said contract is hereby modified as follows:

Appendix A, attached to this' supplemental agreement and made a part hereof,

~

1.

provides for the research to be performed by the Contractor during the contract period specified therein.

In Article II - The Period of Performance, the date " March 31, 1981 2.

is substituted for the date " December 31, 1980 ".

is substituted for In Article III - Consideration, the sum "$450,936.00 "

3.

the sum "$440,936.00".

G

  • 1*4180ogg

Forelemntal Ae ec ent to Centreet No. ffRC-04-76-352

/

Pane 2 ih i.iii.E55..'.4ET.ECT, Lt.c ;:.rti:: h:/: e.et'.'ted this dncoment.

UNITED STATES OF AMERICA BYLKElloggVf..",orton, Chief P

Research Contracts Branch Division of Contracts U. S. fluclear Regulatory Coramission f

WA If(GT U IVER March 23, 1981 BY.

._ 2 2 3.- a m

Wallace C. TreiDel Governmene Fine,1 n.13H m,.

,,,.s 3,9,,

n i g g e,g (title)

_, certify that I am the Barbara J. Zi= merman I,

(attester) of the Contractor named under this Secretary, Board of Regents (title) who signed this Wallace C. Treibel document; that (signatory) covernment Fiscal Relations and document on behalf of said Contractor was then racent vIricer of said Contractor; that this document was duly signed for and on behalf of said Contractor by authority of its governing lody and is within the scope of its legal powers.

IN WITt1ESS WHEREOF, I have hereunto affixed rny hand and the seal of said 0

Contractor.

/l

- u }.

mm 8

[

Barbara J. Zimmerman (SEAL)

I r;'.... ; ;. '.

cr. ;

Coriti act i;c. 7;RC.O.;_ ;_;

CC!iTRACICR: UliIVERSITY OF WASHIt:3T0!;

APPEliDIX A For the Contract period January 1,1981 through March 31, 1981 Article A-I RESEARCH TO BE PERFCRMED SY C0tiTRACTOR The unclassified scope of work under this contract entitled " Distribution of Coefficients for Transuranic Elements in Aquatic Environments" is as (a) follows:

Publication of the following Topical Reports Task I:

XV.

Comparison of Dialysis and

.10/1/80 T. H. Sibley, W. E. McConnaha and Constant Shaking Methods W. R. Schell for a Sediment-Water System from Catarraugus Creek.

XVI. Effects of pH on the 11/1/80 T. H. Sibley, A. Sanchex and icients DisgvCoributjgnCoyf[Ru, W. R. Schell Sr, gjICs, 237Pu, 24I m and A

244Cm in Laboratory

~

Sediment Mater Systems.

XVII.

Effect of Sediment 11/1/80 A. Sanchez, T. H. Sibley, Concentrations on E. Wurtz and the Distribution W. R. Schell

OCo, ggeffignts 23hu,24 44Cm P

and in Laboratory Sediment-Water Systems.

The Principal Investigator expects to devote the following approximate (b) amount (s) of time to the contract work:

W. R. Schell:

100% of his time for 1 month ARTICLE A-II WAYS AND MEANS OF PERFORMANCE.

Items for which support will be provided as indicated in A-III, below (a) 5,520.00 (1)

Salaries and Wages (2)

Equipment to be purchased or fabricated by the Contractor

- - ~

"ocification No. 7 Supplemental Agreemen:

Contract !.o.

NRC-04-76-252 Accandix A Page 2 (3) Travel -

(i)

Coc..estic (ii)

Foreign

.0 -

(4) Other direct costs including fringe benefits (5)

Indirect costs based on a predetermined rate of 34 percent applicable to Total Direct Costs minus Sub Grants and Sub Contracts, Renovations and Alterations, Education Assistance, Patient Care.

Items, if any, significant to the performance of this contract, but (b) excluded frcm computation of Support Cost and from consideration in proportioning costs:

None (c) Time or effort of principal Investigator (s) including indirect costs and fringe benefits contributed by Contractor but excluded from com-putation of Support Cost and from consideration in proportioning costs:

None Article A-III The total estimated cost of itemg'ge[0 A-II(a) 3bove for -the contract period stated in this Appendix A is $ I

the Commission will pay 100 percent of the actual costs of these items incarred during the contract period stated in this Appendix A, subject to the provisions of Article -III and Article B-XXVIII.

The estimated NRC Support Cost for the contract period stated in this Appendix A is $10,000.00 The estimated flRC Support Cost is funded as follows:

(a)

Estimated unexpanded balance from prior period (s)

$ (b) t'ew funds for the current period

$ 10,000.00 (c) The new funds being added in A-III(b) constitute the basis for advance payments provided under Article B-X.

- - -