Discusses Util Actions Re IE Bulletin 81-01, Surveillance of Mechanical Snubbers. All Defective Snubbers in Unit 1 Have Been Replaced or Repaired.Insp of Remaining Unit 2 Snubbers Will Be Complete Prior to 810415 Bulletin Response
ML19350C877
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/30/1981
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-81-01, IEB-81-1, NUDOCS 8104080041
Download: ML19350C877 (1)


Text

/Jabama bbwer [cSEpany 600 North 18th street

/ by Post Offica Box 2641 Birmingn:rn, Atbama 35291 Tclephone 205 783-6081 b

F. L Clayton, Jr.

Senior Vice President Alabama Power Fhntrtdge Building l

'{.}v the Southern erwi,% SySlem March 30, 1981 m

Docket No /50 1

W-348

/

ji? Gl[*l)I/r %

Mr. James P. O'Reilly r-ej U. S. Nuclear Regulatory Comission e'

N,i, O '4

[k

3 nNfdgre,, N[F I0dh M 101 Marietta Street N. W.

{

Suite 3100 0

Atlanta, Georgia 30303

/f, x<

4'/ qi G l

/

Decr Mr. O'Reilly:

I.E.Bulletin 81-01 Due to the press of licensing and related activities associated with the start-up of Farley Unit 2, Alabama Power Company has been unable to complete its formal response to I.E.Bulletin 81-01.

Submittal of this response is currently scheduled for April 15, 1981.

Alabama Power Company has, however, completed physical inspection of all safety-related mechanical snubbers in Farley Unit 1 and replaced or repaired any defective snubbers.

In Farley Unit 2, the physical inspection of all inaccessible safety-related mechanical snuPars has been completed and all defective snubbers replaced or repaired.

Inspection of all remaining safety-related mechanical snubbers in Farley Unit 2 will be completed prior to Alabama Power Company's formal response to I.E.Bulletin 81-01 on April 15, 1981.

The results of these last inspections will be included in the April 15 response.

It should be noted that neither Farley Unit 1 or 2 have any INC snubbers and the formal response will address bulletin action items 3 and 4 only.

If you have any questions, please contact me.

Yours very truly, 04-Jr.

/

b. Clayton,j FLCjr/CLB t

cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Office of I & E Division of Reactor Operations, Washington, D. C.

Office of I & E Division of Construction Inspection, Washington, D. C.